Cassidy Waters (@CassidyAWaters) header
Cassidy Waters (@CassidyAWaters) profile picture

American citizen 🇺🇸 Chasing world-changing builds 🏗️ Access, compute, and energy = a better world ⚡️ In it for the Long Haul 🪡

Utah, USA
Joined February 2010
Photo by Cassidy Waters (@CassidyAWaters)Photo by Cassidy Waters (@CassidyAWaters)Photo by Cassidy Waters (@CassidyAWaters)Photo by Cassidy Waters (@CassidyAWaters)Photo by Cassidy Waters (@CassidyAWaters)Photo by Cassidy Waters (@CassidyAWaters)Photo by Cassidy Waters (@CassidyAWaters)Photo by Cassidy Waters (@CassidyAWaters)Photo by Cassidy Waters (@CassidyAWaters)Photo by Cassidy Waters (@CassidyAWaters)
Ohio just approved 2,150 megawatts of new natural gas power plants that won't connect to the public grid at all. On Nov 19th the Ohio Power Siting Board cleared a 1,350 megawatt plant in Millersport to power four data centers on a @VantageDC campus and an 800 megawatt plant in Ashville for EdgeConneX data centers. Three more big builds 👇 1. ⚛️ Fusion company Pacific Fusion got New Mexico's first radioactive materials license for a private fusion company, clearing it to use tritium, a heavy form of hydrogen used as fusion fuel, at its $1 billion campus under construction in Albuquerque. 2. 🚂 The state-owned Alaska Railroad gave final approval to a $311 million, 32 mile rail line linking Port MacKenzie, a deep water port across Cook Inlet from Anchorage, to its main line near Houston, Alaska. 3. ⚓ New York Governor Kathy Hochul (@GovKathyHochul) announced $228 million for five port and shipyard projects, led by $100 million for a new heavy lift wharf at the Port of Coeymans. Long Haul Ledger tracks where the world is building. Check out the ledger here: longhaulledger.com/?x=1
3
1
27
Get The Monday Haul free by subscribing here: longhaulledger.com/join/?x=1 📸 The Oregon Clean Energy Center, a natural gas power plant in Oregon, Ohio. Photo: MrJacon000, CC BY-SA 4.0, via Wikimedia Commons (cropped and brightened).
10
“I am honored to return to NVIDIA and lead one of the most consequential technology companies in the world at the beginning of a new industrial revolution,” said Jensen Huang. “I take this responsibility with the greatest humility and renewed commitment. I want to thank the NVIDIA Board for its confidence and deliberation through this process. I am especially grateful to Harvey Jones for his leadership as Chair, and to Colette Kress and our executive staff for leading NVIDIA during this period. I am also deeply thankful to our employees, shareholders, leaders across the industry and partners around the world for their extraordinary support. Above all, I am grateful for the love and support of my family. I can’t wait to get back to work.”
“The NVIDIA Board of Directors has made the correct and proper decision to return Jensen Huang to the position of CEO… Congratulations to Jensen, the NVIDIA Board, to the People of the United States — and, indeed, the World!” - President DONALD J. TRUMP
31
NVIDIA (NASDAQ: NVDA) today announced that effective immediately, Jensen Huang has been reinstated as President and Chief Executive Officer and as a member of the Board. The Board of Directors voted unanimously to reinstate Mr. Huang following a series of discussions and meetings with Mr. Huang, after which the Board was satisfied with respect to Mr. Huang’s candor and ability to lead NVIDIA.
1
76
10,000 Year Empire
1
13
Elon has bestowed the chef's-kiss on AI6, and if you’ve ever had a world-class chef give you one of those, well. AI5 is Tesla's next AI chip, and Elon said this morning it's skipping the cars and going straight into the robots 👇 • AI4 is the self-driving computer already in every new Tesla. Elon says it's enough for superhuman driving, so cars stay on it. No need to give the toasters too much thinking space • AI5 is the next, much more powerful chip, and it goes to @Tesla_Optimus first, along with Tesla's AI data centers • Samsung's fab in Taylor, Texas and TSMC's in Arizona both make AI5, and Samsung is aiming for volume production in the second half of 2027 • Chips keep getting pricier too. Elon says AI4 now costs twice as much because memory and storage prices jumped • That's the whole case for Terafab, the giant chip plant @SpaceX and @Tesla plan in Grimes County, Texas, to make chips for Optimus and Cybercab. Phase one is $16.8 billion, with volume output targeted for late 2028 Makes sense when you think about it. A robot has to see, walk, balance and work with its hands all at the same time. That's a lot more thinking than staying in a lane. Every chip that goes into a robot is a bet on who does the heavy, dull and dangerous work. If more of those chips get made in Texas and Arizona, that means more good jobs here, more stuff built close to home, and more hours back in your day.
2
1
160
Elon's AI5 answer came in a reply this morning. The fab dates come from @Reuters and @tomshardware. These are target dates, so they could move as the fabs come online. FSD is still supervised, and older HW3 cars don't have an upgrade date yet. More big builds: longhaulledger.com
19
The aluminum foil in your kitchen is about 99% pure and made to bend. The aluminum that keeps astronauts alive in orbit is a different metal entirely. @vast is building its Haven-1 space station in Long Beach, and @ashleevance and @corememory just spent two hours inside the factory 👇 • Rocket tanks lean on alloys like 2219: aluminum mixed with about 6% copper plus a little manganese, zirconium and vanadium • Heat-treated, it ends up several times stronger than the soft stuff in your drawer • It stays tough at deep cold instead of cracking, and it welds well • NASA built Saturn V fuel tanks and the early Space Shuttle external tank out of it • Vast switched Haven-1 from stainless steel to aluminum in 2024 and went from zero aluminum work to a pressure-tested hull in 15 months Flat plates get milled, rolled into barrels and welded shut until they can hold air in a vacuum. Vast says it's the first space station structure built in the U.S. in over 20 years. Anyway, this is a really cool one. It's long, so strap in and prepare to be amazed. youtube.com/watch?v=mw0E8sC9…
1
1
68
Within the first minute or so of the interview, Max talks about how important it is for humanity to pursue the high frontier. I wrote about exactly this in The Serious Endeavor: why a space-faring civilization doesn't run out of enthusiasm 👇 teapawt.org/CassidyAWaters/status/…
Longevity escape velocity meets multiplanetary escape velocity. Why space-faring civilizations do not run out of enthusiasm. The Stanford torus, O’Neill cylinders, Moon bases, Mars, reindustrialization, and the next rung of the ladder.
1
30
A computer chip is smaller than your fingernail. The factories that make them can be some of the biggest buildings on Earth. Here's what fills a chip fab 👇 • @intel says one fab holds 1,200 multimillion-dollar tools plus 1,500 pieces of utility equipment, stacked on four levels about 70 feet tall • Its clean room could fit four football fields, and it's kept 10,000 times cleaner than a hospital operating room • One @ASMLcompany EUV machine weighs about 180,000 kilograms and ships in 40 freight containers on 3 cargo planes • TSMC's first Phoenix fab uses about 4.75 million gallons of water a day, 65% of it recycled, and APS estimates the whole campus would draw about 1.9 gigawatts once it's fully built • @SpaceX and @Tesla plan Terafab in Grimes County, Texas, with more than 100 million square feet of manufacturing space. The first phase alone is more than $16.8 billion and 3,000 jobs So when someone says a chip plant could be the biggest building on Earth, it makes sense once you see what's inside. Huge machines, and a whole town's worth of air, water, gas and power to feed them. Every phone, car and AI tool you use starts in a room like that. Building more of them here means more good jobs in Texas, Arizona and Oregon, and more of the chips we all depend on made close to home.
3
2
242
Terafab is still a plan. SpaceX's IPO filing called it a "general framework" with no binding commitments, and the 100 million square feet counts all manufacturing space, not just clean room. Elon has called volume chips around the third quarter of 2028 an aspiration. The fab numbers come from Intel's own fact sheet on what it takes to build one. The Phoenix power figure is from a contract state regulators still have to approve. Why chip factories are so big, with every source: longhaulledger.com/explainer… Sources: @intel, @ASMLcompany, @ENRnews, @KBTXNews, @ElectrekCo and the Texas Governor's office 📸 | Intel Free Press via Wikimedia Commons (CC BY 2.0). Cranes building Intel's D1X chip fab in Hillsboro, Oregon, October 2011.
30
Terafab is still a plan. SpaceX's IPO filing called it a "general framework" with no binding commitments, and the 100 million square feet counts all manufacturing space, not just clean room. Elon has called volume chips around the third quarter of 2028 an aspiration. The fab numbers come from Intel's own fact sheet on what it takes to build one. The Phoenix power figure is from a contract state regulators still have to approve. Why chip factories are so big, with every source: longhaulledger.com/explainer… Sources: @intel, @ASMLcompany, @ENRnews, @KBTXNews, @ElectrekCo and the Texas Governor's office 📸 | Intel Free Press via Wikimedia Commons (CC BY 2.0). Cranes building Intel's D1X chip fab in Hillsboro, Oregon, October 2011.
24
Four giant foundations are going in at Tesla's new robot factory in Austin, and they look made for some of the biggest machines in manufacturing. Drone pilot @JoeTegtmeyer flew over the Optimus factory at @Tesla's Giga Texas today. Here's what he caught: • Four foundations packed with rebar on the southeast side of the building • Frame mounts for IDRA Giga Presses set into the rebar before the concrete pour • It's the same setup he filmed under the casting machines in the main Giga Texas plant • A Giga Press squeezes molten aluminum into one big part in a single shot. The Cybertruck presses in the main plant are rated at 9,000 tons • Up next: the concrete pour, then the IDRA press parts arriving on site Tesla says this Texas line is being designed to build up to 10 million @Tesla_Optimus robots a year over the long run. Casting big parts in one shot instead of welding dozens of small ones together is how you even try for numbers like that. So freakin' cool to watch this one start from the dirt. Cheap, simple parts are what make a robot affordable, and affordable robots could take on the heavy, boring and unsafe jobs in factories and warehouses, and maybe one day the chores around your house.
3
59
Joe's original post with all five drone shots: teapawt.org/JoeTegtmeyer/status/21… Quick caveat: the Giga Press part is Joe's read from the frame mounts. Tesla hasn't said what goes on these pads. The 10 million a year is Tesla's long-term design target from its Q1 update, and its latest update still lists the Texas Optimus line as under construction. 📸 Photos: @JoeTegtmeyer More big builds: longhaulledger.com
At the Giga Texas Optimus factory SE side, the four reinforced foundations are getting the IDRA GIga Press frame mounts installed into the rebar ahead of pouring the concrete. This is exactly the same as what we saw with all the casting machines installed in the Casting section of the main Giga Texas factory & something I’ve been waiting to show. Pretty much confirms what I’ve been hearing & I will stay on the lookout for the IDRA press parts deliveries when they arrive on site. @lucagrecoita
14
The biggest buildings on Earth are about to get some competition from a field in Texas. Here are the record holders it's up against 👇 • New Century Global Center, Chengdu: 18.9M sq ft • Dubai Airport Terminal 3 (@DubaiAirports): 18.4M sq ft • Abraj Al-Bait, Mecca: 17M sq ft • @Samsung's Pyeongtaek chip fab: 10.7M sq ft • @Tesla Giga Texas: 10M sq ft • Aalsmeer Flower Auction, Netherlands: 8.4M sq ft • Surat Diamond Bourse, India: 7.1M sq ft • The Pentagon (@DeptofWar): 6.5M sq ft • Mall of America (@mallofamerica): 5.7M sq ft • Haas Automation, Henderson NV: 2.4M sq ft • @Boeing Everett: 472M cubic feet, the biggest by volume • Aerium, Germany: 351 feet tall, the biggest free-standing hall • @NASAKennedy's Vehicle Assembly Building: the biggest single-story building Now picture something more than 5 times the size of that Chengdu record holder. @SpaceX and @Tesla are planning Terafab in Grimes County, Texas, with more than 100 million square feet of manufacturing space. That's about 3.6 square miles, or more than 15 Pentagons. The first phase alone is $16.8 billion and about 3,000 jobs. All that space is for making AI chips, the brains inside robots, self-driving cars and the apps on your phone. More of them made here means more good jobs in Texas and less waiting on factories overseas. If it goes up as planned, Terafab could be the largest building in the world. 🏗️
1
95
Terafab is still a plan. SpaceX's IPO filing called it a "general framework" with no binding commitments, so 100 million square feet is the goal, not a done deal. Sizes are floor space except the volume records, and rankings shift depending on who's counting. More big builds: longhaulledger.com Sources: Terafab.ai, @FortuneMagazine, @tomshardware, @ElectrekCo, @KBTXNews, Samsung, @GWR, @KTNV 📸 Terafab: official rendering (terafab.ai). Samsung Pyeongtaek: still from Samsung Semiconductor Newsroom. Dubai Terminal 3: still from Emirates. Giga Texas: Tesla. Aalsmeer: via Tripadvisor. Mall of America: via malls.com. VAB: still from Space Consult. Haas Henderson: Oltmans Construction. The rest via Wikimedia Commons: Chengdu by FMoo (CC0), Mecca by King Eliot (CC BY-SA 4.0), Surat by VaishP (CC BY-SA 4.0), Pentagon by Staff Sgt. Brittany A. Chase, DOD (public domain), Boeing by Jeremy Elson (CC BY-SA 3.0), Aerium by Stefan Kühn (CC BY-SA 3.0).
42
Terafab is still a plan. SpaceX's IPO filing called it a "general framework" with no binding commitments, so 100 million square feet is the goal, not a done deal. Sizes are floor space except the volume records, and rankings shift depending on who's counting. Sources: Terafab.ai, @FortuneMagazine, @tomshardware, @ElectrekCo, @KBTXNews, Samsung, @GWR, @KTNV 📸 Terafab: official rendering (terafab.ai). Samsung Pyeongtaek: still from Samsung Semiconductor Newsroom. Dubai Terminal 3: still from Emirates. Giga Texas: Tesla. Aalsmeer: via Tripadvisor. Mall of America: via malls.com. VAB: still from Space Consult. Haas Henderson: Oltmans Construction. The rest via Wikimedia Commons: Chengdu by FMoo (CC0), Mecca by King Eliot (CC BY-SA 4.0), Surat by VaishP (CC BY-SA 4.0), Pentagon by Staff Sgt. Brittany A. Chase, DOD (public domain), Boeing by Jeremy Elson (CC BY-SA 3.0), Aerium by Stefan Kühn (CC BY-SA 3.0). More big builds: longhaulledger.com
26
Lea County, New Mexico (@LeaCountyNM) approved $130 billion in industrial revenue bonds on Nov 19th for @Google's Project Rancho data center near Hobbs, a lease and tax deal with no county borrowing. Plans call for two 900,000 square foot buildings powered by a 2 gigawatt solar field 3 miles away, with construction expected to start in 2027. Three more big builds 👇 1. ⚡ Utility @evergypower's $1 billion, 710 megawatt natural gas power plant near Hutchinson, Kansas, is expected to bring about 650 construction workers on site at peak. 2. ♨️ Geothermal developer Controlled Thermal Resources hired the bank BBVA to arrange about $420 million in debt for its first 50 megawatt power plant at the Salton Sea in Imperial County, California, aiming to start construction in 2027. 3. 🚛 Semitrailer maker Stoughton Trailers is adding 1,150 jobs from mid 2026 through the end of 2027, about 1,000 of them at its three plants in south central Wisconsin. Long Haul Ledger tracks where the world is building. Check out the ledger here: longhaulledger.com/?x=1
2
73
Get The Monday Haul free by subscribing here: longhaulledger.com/join/?x=1 📸 Google's data center in Council Bluffs, Iowa, at sunset. Photo: Chad Davis, CC BY 2.0, via Wikimedia Commons (cropped and brightened).
24