Slinging our 2nd round of bulk gypsum this year. Another 80 tons. The small piles/chunks will get knocked down with the next fairway mow and some rainfall. The good news - sodium levels in tissue samples have been the lowest in 20 years this season!
Given the rainfall over this past weekend and cold temperatures this week fairway aerification will be postponed until November 13th. We are proceeding with greens aerification and will have 9 holes open on Wednesday.
Our 4th extra aerification of the Mega green was completed Monday to combat the sod layer within the profile. The last of the year will take place the week of October 30th.
Topdress, fertilizer and final wetting agent application🤞 yesterday. Mechanic is going to be grinding all day!
Some heavier water put on fairway spots (particularly holes 8-10) this morning as we get down wetting agent ahead of this long, hot spell.
Any trees you see marked with white flags are not being marked for removal. These are ash trees that we are treating for emerald ash borer.
The large hornets you see on holes 5 and 11 are cicada, killers, and although scary represent no danger to golfers. Once we find their burrows we can work on eliminating them.
We will start light top dressing of these drainage trenches on 9 and 18 that have settled a bit. Unfortunately can’t go too heavy during this dry hot weather.
Some extra water on select fairways to knock down an insecticide application and spot wetting agent application on greens for LDS
5-6” tender roots on the first plug pulled as the cups go in the Mega green for Grand Opening tonight.
Vertiquake 7” deep on fairways for additional drainage and gas exchange in progress. Start slinging 80 tons of gypsum next week on rough and fairways to improve soil structure.
First aerification of the practice putting green today. Small tine just deep enough to penetrate the sod layer.
Most of the collar areas that had declined have been resodded now that greens aerification is complete.
Day 2 of Fairway aerification went great. All the fairways finished with 1st rough bulk cleanup. Greens hit with another topdress and fertilizer application. Holes already starting to close up.
Will work on fine tuning cleanup on fairways today and tomorrow.
All greens aerified today but due to the overcast skies and occasional drizzle, we have been unable to work sand properly into the green canopies today.
A lot of work done this week on the master plan and capital projects. We’re behind schedule on addressing the weeds, but will get them under control next week with the good weather.