Stuff Working Good retweeted
what kind of post is this 💀
White Sox appeareal has been a fashion statement FOREVER.
Don’t talk about the White Sox if u don’t know anything about em
Replying to @himbopresident
I genuinely don't think I ever saw a person in a White Sox cap until a bunch of Logan Square transplants decided they were the Chicago equivalent of the Mets for some reason, I don't think I ever met an Illinois native who was a White Sox fan
Stuff Working Good retweeted
アイアムジャパニーズはホワイトソックス内外(他のチーム知らないけど多分)どの球団ねわも有名です!!!!!
毎日のようにみんなが笑って使ってます🤣
今回インタビューで咄嗟に出てしまい使わせてもらいました🙇
@川崎宗則 MUNENORI KAWASAKI
Stuff Working Good retweeted
7/11 Looks 👀
Sorry for running late today, gonna go get rowdy at the white sox game now😈
Stuff Working Good retweeted
7/10 Looks 👀
Created my own Unique Highlight on Propfinder last night and i’m feeling good about it.
I will be tweaking it as time goes and will share it with everyone once it is all said and done.
For those who didn’t know.. check the animation when u like something this weekend :)
Also Balogun is back LFG
Stuff Working Good retweeted
New month- New sheets😏
6/3 HR/Bases Looks👀
Going to be making these more stat filled as time goes on. I’m just trying it out for my first time today!
Inspired by @ArcherTargets thanks
Stuff Working Good retweeted
Learn how 1 million pound planes actually fly
How are 1 million pound planes able to fly?
Blue Origin's New Glenn just blew up at LC-36 while attempting to Static Fire ahead of NG-4.
The explosion occurred around 9 PM EDT tonight during an attempt to ignite the rocket’s seven BE-4 first-stage engines ahead of NG-4, which was slated to carry 48 Amazon Project Kuiper satellites. No injuries were reported.
The explosion destroyed the rocket, its launch equipment, and a lightning protection tower.
NG-3 had already lost its payload due to a second stage anomaly, so NG-4 was supposed to be the recovery mission - and the first of 24 Amazon-contracted launches.
Bezos posted on X: “It’s too early to know the root cause but we’re already working to find it. Very rough day, but we’ll rebuild whatever needs rebuilding and get back to flying.”
A CNC (Computer Numerical Control) machine starts with a digital design file – typically a CAD model – that gets translated into G-code, a language of coordinates and motion commands. The machine’s controller reads this code and converts it into precise electrical signals sent to stepper or servo motors, which drive movement along multiple axes (X, Y, Z, and sometimes rotational axes). Every cut, pass, and position change is executed by following this pre-programmed sequence with no manual input required during the run.
The cutting itself depends on the machine type. A milling machine spins a cutting tool against stationary material, removing it in layers. A lathe spins the material while a stationary tool removes it. A router, plasma cutter, or laser each use different energy delivery mechanisms, but the motion control logic is the same across all of them. The tool path – the exact trajectory the cutting head follows – is generated by CAM software, which optimizes for things like cut depth, feed rate, and tool wear.
Feedback is what separates a good CNC machine from a great one. Closed-loop systems use encoders on the motors to continuously report actual position back to the controller, correcting for any drift or error in real time. Open-loop systems (cheaper, more common in hobbyist machines) just trust that the motor moved where it was told – which works fine until it doesn’t, like when a stepper skips steps under load.
A well-tuned CNC machine can hit tolerances in the range of ±0.001 inches, run the same program a thousand times, and produce the same part each time. That consistency is what makes it foundational to modern manufacturing.
NASA’s X-59 Prepares for First Supersonic Flight
The X-59 made its first flight in October 2025, went through scheduled maintenance, then returned in March 2026. It has since completed 14 additional flights , working through envelope expansion at lower altitudes and subsonic speeds.
It’s about to begin a new block of test flights that will include its first time flying faster than the speed of sound. The target is Mach 1.4 (925 mph) at a “mission conditions” flight altitude.
NASA’s Quesst mission will then survey how people respond when the X-59 flies overhead, sharing reactions to the quieter sonic “thumps” with national and international regulators to inform new data-driven noise thresholds for supersonic commercial flight over land.
The core engineering trick – shaping the airframe so shockwaves don’t coalesce into a single N-wave boom – is the real story. If the community noise data holds up, it’s the regulatory unlock that Boom Supersonic and others need to operate over land without the Concorde-era restrictions.
OEE and OOE measure the same three things - Availability, Performance, and Quality - but against different denominators. OEE only counts the hours you planned to run, so it tells you how the machine performs when you actually use it. OOE counts all the hours the asset could’ve been scheduled, which exposes the shifts you never staffed. Same week, same equipment, two different numbers.
The example in the deck shows it: 70 productive hours out of a 100-hour plan is 70% OEE, but against the 120 hours that were actually available it drops to 58% OOE. Neither number is wrong. They just answer different questions: one’s about the machine, the other’s about how you’re using it. TEEP takes it further and uses the full 168-hour week, which is useful when you’re deciding whether to buy more capacity or just add a shift.
Stuff Working Good retweeted
I logged in today and found that my follower base has doubled overnight....why is that - because I am posting things that I do, things that I enjoy, and my story. It resonated with people, X is teeming with engineers, developers, techs, and everything in between. This kind of content is necessary. X isn't just a debate stage for politics, it's full of very interesting and capable people, which is obvious. I honestly never knew it. I have thousands of people to follow back, and I will - its going to take a bit since there are follow back limits, but I'll work tough it. For now - here's a massive robotic welding cell we were building that had an 8000# welding fixture, 2x Fanuc M710iC/20L welding robots, Lincoln welding equipment, a Gudel servo RTU track. This fixture is mounted on a custom designed headstock system that has dual-sync servo drives from both ends - for both rotation and lift. We had to lower the entire fixture down so it could be loaded, then raise it back up so that it can rotate about its horizontal axis... so dual sync rotary and dual sync raise/lower. We built it all in-house with CNC mills, CNC lathe, CNC waterjet, powder coated in-house, I had to send out the yellow structure for stress relief and machining on a large format horizontal. This one pushed the boundary for my company, but we did it anyway.































