🚧 BSTP UPDATES | CORRIDOR–2 | MALLIGE LINE | PACKAGE C2B
📍 1. Chikkabanavara – Elevated Station & Viaduct
✅ Station Deck Slab: 3 nos. completed
✅ Station Pier Arms: 9 nos. completed
🔄 Portal Beam Work: In progress
✅ Viaduct Deck Slab: 5 nos. completed
✅ Piling Work: 129 piles completed.
📍 2. Myadarahalli – At-Grade Station
🔄 Concourse Slab: 102 m completed; further reinforcement work in progress
🔄 Terrace Deck Slab: Staging work in progress.
📍 3. Shettyhalli – At-Grade Station
🔄 Concourse Slab: 126 m completed; further reinforcement work in progress
🔄 Terrace Deck Slab: Staging work in progress.
📍 4. Yeshwanthpur – Elevated Interchange Station
🔄 Ground Floor Slab: 185 m completed; reinforcement work in progress
🔄 Lower Platform Slab: Reinforcement work in progress
📍 5. C2B Casting Yard – Hessarghatta
🏗️ Viaduct I-Girders: 40 nos. cast
🏗️ Station I-Girders: 28 nos. cast.
📸Here are the latest glimpses of construction progress across various locations of BSTP Corridor–2, Mallige Line, Package C2B.
#Bengaluru_Suburban_Rail_Project
#BSRP
@RailMinlndia
@AshwiniVaishnaw
@VSOMANNABJP
@MBPatil
@EIB @KfW_FZ_int @chiefsecy_gok
@SWRRLY @RVNL @PJB @NCC @Ltditd
@TheMetroRailGuy
@RailAnalysis
@MetroRailNewsHQ
@Railwhispers
@railnmetrotoday
@bengalurutrains
ಶ್ರೀ ಮಹರ್ಷಿ ವಾಲ್ಮೀಕಿ ಜಯಂತಿಯ ಭಕ್ತಿಪೂರ್ವಕ ನಮನಗಳು 🙏🌸
ಆದಿಕವಿ ಮಹರ್ಷಿ ವಾಲ್ಮೀಕಿಯವರ ಸತ್ಯ, ಕರುಣೆ ಮತ್ತು ಧರ್ಮದ ಉದಾತ್ತ ಮೌಲ್ಯಗಳು ನಮ್ಮೆಲ್ಲರಿಗೂ ಸ್ಫೂರ್ತಿಯಾಗಲಿ. ಅವರ ಜ್ಞಾನ ಮತ್ತು ಆದರ್ಶಗಳು ನಮ್ಮನ್ನು ಸಾಮರಸ್ಯ, ಶಾಂತಿ ಹಾಗೂ ಮಾನವೀಯತೆಯ ಹಾದಿಯಲ್ಲಿ ಮುನ್ನಡೆಸಲಿ. 🙏
-ಕ-ರೈಡ್/ ಬಿ-ರೈಡ್
#KRIDE #MaharishiValmiki #ValmikiJayanti2026 #MaharishiValmikiJayanti #SanatanDharma #IndianCulture
🚆 BSTP | RAILWAY DOUBLING PROJECT |⚡ ELECTRICAL PROGRESS UPDATES
📍 1. Baiyyappanahalli–Hosur (DL) | 48 km – Anekal Yard
🔄 OHE catenary wire stringing work is in progress.
🔄 Dropper clipping work is in progress.
📍 2. Maranayakanahalli (MNKH) Section
⚡ OHE load transfer using a ladder trolley is in progress under a Power Block.
📍 3. YPR–Hebbal | Corridor 2
✅ As part of electrical utility shifting, Cable laying works from BEL road to Jayaram colony, are in progress.
✅ CSS foundation work completed.
📍 4. Thanisandra Station | Corridor 4B
🔄 OHE (TTC) foundation casting work is in progress.
📌 Here's a look at the latest electrical progress across the BSTP and Railway Doubling Projects at the above locations.
#Bengaluru_Suburban_Rail_Project
#BSRP
@RailMinlndia
@AshwiniVaishnaw
@VSOMANNABJP
@MBPatil @EIB @KfW_FZ_int
@chiefsecy_gok @SWRRLY
@RVNL @PJB @NCC @Ltditd
@TheMetroRailGuy
@RailAnalysis
@MetroRailNewsHQ
@Railwhispers
@railnmetrotoday
@bengalurutrains
📢 VACANCY NOTIFICATION
K-RIDE / Bi-RIDE Recruitment 2026
K-RIDE / Bi-RIDE, a joint venture of the Government of Karnataka and the Ministry of Railways, invites applications from eligible officers and professionals for various positions on a contractual basis.
📌 Projects:
Bengaluru Suburban Transport Project (BSTP)
Railway Doubling Projects
🔗 For detailed information on eligibility criteria, terms of engagement, and the application process, visit the official website:
kride.in/careers-in-k-ride/
#KRIDE #Recruitment #BSTP #CareerOpportunity #RailwayInfrastructure
🚧 K-RIDE/Bi-RIDE | BSTP – Earth Pit Resistance Testing | C4A
📍 Singena Agrahara Station & Heelalige Station
Month: October 2026
⚡ Earth Pit Resistance Testing for the month of October 2026 was successfully completed at Singena Agrahara Station.
🔍 The testing was carried out to verify the effectiveness and safety of the earthing system.
✅ Testing Completed Successfully
🦺 Electrical Safety | Reliable Earthing | Zero Harm
#KRIDE #BSTP #C4A #EarthPitTesting #Earthing #ElectricalSafety #SafetyFirst #SHE #HSE #ZeroHarm
YPR–CSDR Doubling Project: New Parcel Office Inaugurated at Yeshwantapur
Bengaluru | 22 October 2026
The Yeshwantapur–Channasandra (YPR–CSDR) 21.70 km Doubling Track Project, executed by KRIDE/Bi-RIDE, achieved another significant milestone with the inauguration of a new Parcel Office at Yeshwantapur on 22 October 2026.
The facility was inaugurated by Shri Ashutosh K. Singh, Divisional Railway Manager (DRM), Bengaluru Division, South Western Railway, and Shri Lakshman Singh, Managing Director, KRIDE/Bi-RIDE. The newly inaugurated Ground floor has been handed over to Indian Railways (IR) to facilitate the efficient handling of increased parcel traffic.
The new RRI cum Parcel Office is designed to enhance parcel-handling capacity, improve operational efficiency and facilitate the smooth movement of goods. The newly constructed Building comprises of G+4 stories out of 4 stories G+3 is meant for parcel related work and one floor is dedicated for S&T, RRI work operation. Once the balance floor work of building will be completed it will provide essential infrastructure for the systematic management of parcel-related activities. The facility is also expected to help ease road traffic congestion around the Yeshwantapur railway premises by enabling better organisation of parcel handling, loading and unloading operations, and the movement of goods vehicles.
More systematic management of these activities is expected to minimise vehicle queuing and roadside obstructions, improve access to railway premises and facilitate smoother traffic circulation in the surrounding area.
The inauguration of the new Parcel Office marks an important infrastructure improvement under the YPR–CSDR Doubling Project. The facility is expected to support more efficient railway operations, strengthen parcel-handling capabilities and contribute to improved traffic management in the Yeshwantapur area.
Officials from KRIDE, PMC (RITES)and the Indian Railways commercial and engineering teams were present at the inauguration.
#Bengaluru_Suburban_Rail_Project
#BSRP
@RailMinlndia
@AshwiniVaishnaw
@VSOMANNABJP
@MBPatil
@EIB @KfW_FZ_int
@chiefsecy_gok
@SWRRLY
@RVNL @PJB @NCC @Ltditd
@TheMetroRailGuy
@RailAnalysis
@MetroRailNewsHQ
@Railwhispers
@railnmetrotoday
@bengalurutrains
🚧 BSTP Updates | Corridor-4 | Kanaka Line | Package C4B
📍 Location: Channasandra Station (At-Grade)
Current Progress:
✅ Raft concreting completed between Grids 13–2.
✅ 22 nos pier are completed out of 26 nos.
✅ one portal beam is completed at grid no 10.
🔄 Raft reinforcement work in progress between grid 2-1.
🔄 3 nos Portal Beams reinforcement and shuttering work are currently in progress.
📸 Here's a glimpse of the ongoing civil construction works at Channasandra Station, Corridor-4, Package -B
#Bengaluru_Suburban_Rail_Project
#BSRP
@RailMinlndia
@AshwiniVaishnaw
@VSOMANNABJP
@MBPatil @EIB @KfW_FZ_int
@chiefsecy_gok @SWRRLY
@RVNL @PJB @NCC @Ltditd
@TheMetroRailGuy
@RailAnalysis
@MetroRailNewsHQ
@Railwhispers
@railnmetrotoday
@bengalurutrains
🚆 BYPL–HSRA (48 km) Doubling Track Project – Progress Updates
Significant progress has been achieved in the execution of the BYPL–HSRA (48 km) Doubling Track Project.
✅ Track Linking: Track linking work between Hosur and Maranayakkanahalli is in progress, marking a key milestone towards the commissioning of the Anekal–Hosur doubling section.
✅ Rail Renewal: Rail renewal using 60 kg rails / 20-rail-long panels has been completed.
🔄 Civil Works: Further civil works are currently in progress.
The project is progressing towards the completion of the doubling track works, aimed at enhancing line capacity and improving operational efficiency.
Follow our official pages for regular Project updates
X : xitter.cf/KridePrm?lang=en
LinkedIn: linkedin.com/in/kride-bengal…
Instagram: instagram.com/kride_bsrp/
Facebook: facebook.com/share/1Kv3DtWBh…
Whats App Channel: qr1.me-qr.com/od07rtkt
YouTube: youtube.com/@kridepr/posts
🚧 K-RIDE | BSTP – Safety Awareness Session | C4A | RVNL–RPPL
📍 Singena Agrahara Station
🦺 Portable Tools & Equipment Safety Awareness Session was successfully conducted at the station.
🔑 Key Safety Points:
🔹 Use the right tool for the job.
🔹 Inspect tools before use.
🔹 Use tools only as intended.
🔹 Maintain proper posture & stable footing.
🔹 Keep hands away from moving/cutting parts.
🔹 Use required PPE & proper ventilation.
🔹 Keep flammables away from sparks/hot work.
🔹 Isolate power before maintenance.
🔹 Store tools safely after use.
🔹 Only trained & authorized persons to operate specialized equipment.
🔹 Keep emergency exits & fire equipment accessible.
🔹 Report unsafe conditions & near misses immediately.
🔹 Conduct regular Toolbox Talks & refresher training.
🛡️ Safe Tools | Safe Work | Zero Harm
🤝 Safety is Everyone’s Responsibility
#KRIDE #BSTP #C4A #SafetyAwareness #ToolSafety #ConstructionSafety #SHE #HSE #SafetyFirst #ZeroHarm
🚧 K-RIDE | BSTP | TBT
📍 LC 144A
🦺 Toolbox Talk (TBT) – Health & Safety Awareness
A Toolbox Talk (TBT) was conducted at LC 144A to reinforce essential health and safety precautions among workers.
🔹 Personal Safety: Follow safe work practices at all times.
🔹 PPE: Use the required Personal Protective Equipment correctly.
🔹 Hydration: Stay adequately hydrated throughout the work shift.
🔹 Sun Protection: Take necessary precautions while working under direct sunlight.
🔹 Safety Awareness: Stay alert and identify potential hazards before starting work.
🎯 Safety First | Stay Alert | Stay Protected | Stay Hydrated.
#K_RIDE #BSTP #TBT #ToolboxTalk #LC144A #SafetyFirst #SafetyAwareness #WorkplaceSafety #ConstructionSafety #HSE #EHS #PPE #PersonalSafety #HeatSafety #SunProtection #StayHydrated #SafeWorkPractices #SafetyCulture #ZeroHarm #WorkerSafety #InfrastructureDevelopment #ConstructionWork
🌼 K-RIDE /Bi-RIDE Wishes You a Happy Dasara 🌼
May this festive season bring happiness, prosperity, and success to all. Wishing everyone a joyful Dasara filled with positivity, new beginnings, and achievements.
Warm festive wishes from K-RIDE/Bi-RIDE
#KRIDE #dasara2026
📌 BSTP PROJECT UPDATE🚇 Corridor–2 | Mallige Line
📍 PACKAGE 2 – AT-GRADE SECTION
🛣️ Stretch: Benaganahalli to Hebbal
📏 Length: 11.569 km
✅ ERS Raft: 524 m completed; further work is in progress.
✅ ERS (Retaining Wall): 3,182 m completed; further work is in progress.
🔄 MIB 546: Shuttering work for both side walls is in progress.
📍 PACKAGE 3 – AT-GRADE SECTION
🛣️ Stretch: Yeshwantpur to Chikkabanavara
📏 Length: 5.985 km
🔄 Viaduct: Work on the 185 m viaduct section is in progress.
✅ Piling Works: 13 piles completed; further piling work is in progress.
✅ ERS Raft: 472 m completed; further work is in progress.
✅ ERS (Retaining Wall): 1,763 m completed; further work is in progress.
🔩 RUB 404A: Top slab reinforcement work is in progress.
Work is progressing across both packages, with further activities ongoing in structural, piling, and retaining wall works.
#Bengaluru_Suburban_Rail_Project
#BSRP
@RailMinlndia
@AshwiniVaishnaw
@VSOMANNABJP
@MBPatil @EIB @KfW_FZ_int
@chiefsecy_gok @SWRRLY
@RVNL @PJB @NCC @Ltditd
@TheMetroRailGuy
@RailAnalysis
@MetroRailNewsHQ
@Railwhispers
@railnmetrotoday
@bengalurutrains
🚧 K-RIDE / Bi-RIDE | BSTP | C4B
📍 Location: Rajankunte Station & Jakkur Station
🔧 Activity: Gas Cutting Set Inspection
🏢 Contractor: M/s. NCC
✅ Gas cutting set inspection was carried out at Rajankunte Station & Jakkur Station along with the Execution Team as part of the C4B BSTP Project.
🦺 Safety First | Quality Always
#KRIDE #BiRIDE #BSRP #C4BProject #RajankunteStation #NCC #GasCuttingSetInspection #EHS #HSE #SafetyCompliance #InfrastructureDevelopment #SafeWorkPractices #ZeroAccidents #SafetyCulture #QualityAndSafety
Ayudha Pooja 2026 Celebrated at KRIDE/Bi-RIDE Corporate Office and BSTP Site Office
Bengaluru, October 17, 2026: Ayudha Pooja 2026 was celebrated with devotion and traditional fervour at the KRIDE/Bi-RIDE Corporate Office and the BSTP C-2 and C-4 site offices in Bengaluru on October 17, 2026.
Traditionally observed as a mark of respect for the tools, equipment, and instruments used in daily work, Ayudha Pooja holds special significance as an occasion to seek divine blessings for success, safety, and prosperity.
The auspicious occasion was marked by traditional rituals and prayers, seeking divine blessings for the organisation’s prosperity, continued progress, and the well-being of its employees.
Shri Lakshman Singh, Managing Director, KRIDE/Bi-RIDE, graced the occasion. Shri. Rajesh Kumar Sing, Director, Project & Planning, KRIDE, Officials and staff of KRIDE/Bi-RIDE, along with representatives from the General Consultant (GC), Engineers, participated in the celebration.
#AyudhaPooja2026 #KRIDE #BiRIDE #BSTP #CorporateCelebration #TraditionAndCulture #SafetyAndProsperity
🚧 K-RIDE / Bi-RIDE | BSTP | C4A
📍 Location: Bellandur Station
🩺 Activity: Monthly Routine Health Check-up
A monthly health check-up was conducted for workers and staff at Bellandur Station under the supervision of Dr. Surruthi and the medical team.
🏥 Health Screening & Medical Examination
1. Blood Pressure (BP) Check-up
2. General Physical Examination
3. Basic Health Assessment
4. Medical Consultation & Advice
5. Fitness & Wellness Monitoring
Health Awareness & Guidance
The doctor interacted with workers and staff, providing medical guidance and awareness on:
🧼 Personal Hygiene
💧 Adequate Hydration
🏃 Physical Fitness
🛡️ Preventive Healthcare
🎯 Objective: To promote good health and overall well-being at the workplace.
Healthy Workforce, Safer Workplace! 🩺✨
#KRIDE #BiRIDE #BSTP #C4A #HealthCheckUp #EmployeeWellness #WorkplaceSafety #HealthAwareness #PreventiveHealthcare #HealthyWorkforce #SafetyFirst #BellandurStation
🚧 K-RIDE | Bi-RIDE – Tender Updates
📍 Project: Railway Doubling Project
📢 Tender Awarded to M/s. Omega Elevators.
The tender for the design, manufacture, supply, testing, and commissioning of 8 lifts has been awarded to M/s. Omega Elevators.
Locations & Lift Details:
•Yeshwanthpur Parcel Office: 2 service-cum-passenger lifts (2-tonne capacity each).
•Hebbal, Banaswadi & Anekal Road Railway Stations: 6 machine-room-less (MRL) passenger lifts (20-passenger capacity each).
#Bengaluru_Suburban_Rail_Project
#BSRP
@RailMinlndia
@AshwiniVaishnaw
@VSOMANNABJP
@MBPatil @EIB @KfW_FZ_int
@chiefsecy_gok @SWRRLY
@RVNL @PJB @NCC @Ltditd
@TheMetroRailGuy
@RailAnalysis
@MetroRailNewsHQ
@Railwhispers
@railnmetrotoday
@bengalurutrains
📢 Vacancy Notification
#KRIDE, a Joint Venture of the Government of Karnataka and the Ministry of Railways, invites applications from eligible officers/professionals for engagement as Additional General Manager/ Jt. General Manager (Signalling &Telecommunication) on Contractual Basis for the Bengaluru Suburban Transport Project (BSTP) and Railway Doubling projects.
🔗 For detailed eligibility criteria, terms of engagement, and application procedure, visit: kride.in/careers-in-k-ride/
#KRIDE #Recruitment #BSTP #CareerOpportunity #RailwayInfrastructure
🚧 K-RIDE | BSTP – Safety Awareness Training | C4A
📍 Bellandur Station
🦺 Topic: Importance of PPE & Proper Usage
A Safety Awareness Training session was conducted for staff and workers, highlighting the importance of proper PPE selection, inspection, and usage.
Helmets | Safety Shoes | Reflective Jackets | Hand Gloves | Goggles | Safety Harnesses
⚠️ The session focused on preventing injuries, falls, and workplace hazards through proper PPE compliance.
🛡️ PPE is the last line of defense.
Let’s stay protected, stay compliant, and make safety a priority.
Safety First. Safety Always. 🦺
#KRIDE #BSTP #C4A #SafetyAwareness #PPE #PPESafety #SafetyTraining #ConstructionSafety #SiteSafety #SafetyCompliance #InjuryPrevention #SafetyFirst #SafetyAlways #Bellandur