Aaron Liddell (@LiddellClaying) header
Aaron Liddell (@LiddellClaying) profile picture

Liddell Claying and Earthworks, Esperance WA #drainage #clayspreading #earthmoving#salintymangement

Condingup, Western Australia
Joined August 2017
Photo by Aaron Liddell (@LiddellClaying)Photo by Aaron Liddell (@LiddellClaying)Photo by Aaron Liddell (@LiddellClaying)Photo by Aaron Liddell (@LiddellClaying)Photo by Aaron Liddell (@LiddellClaying)Photo by Aaron Liddell (@LiddellClaying)Photo by Aaron Liddell (@LiddellClaying)Photo by Aaron Liddell (@LiddellClaying)Photo by Aaron Liddell (@LiddellClaying)Photo by Aaron Liddell (@LiddellClaying)
Aaron Liddell retweeted
This video from @timothyjrinehart shows the impact water has on tires. It seems almost like a magic trick, but it’s physics. The water reduces friction, so the trowel slides right into the rubber instead of bouncing off!
6
6
138
97,015
Getting a bulk sample out and bagged for a mining company. Something a bit different, had to call in the big guns to load the bags.
2
21
2,490
Another silage pit wall to create another pit! Digger can get them nice and high!
2
17
1,244
Aaron Liddell retweeted
Fancy a day in the paddock? 🐏🐮🌱🍻 Register: asheepbeef.org.au/events
1
1
2
895
Finally got the tilt bucket on and working! Not sure how I survived without one this long.
2
1
31
2,970
500mm of gravel holding water back. Time for the swans to jog on.
1
21
15,494
Finally at the original mission, reclaim the road! Couple of culverts in and happy days!
14
1,054
Another day another lake gone.
1
1
38
18,960
Well it’s wetter now after 50mm then it was after the 200mm in June. See if the hole in the pit is still working.
1
3
46
4,072
Well if you can’t beat the rain, join the puddles together! Tide has come back in again so drainage bucket on!
18
1,471
Aaron Liddell retweeted
A bit of training on the long reach arm on the excavator. Takes a bit of practice
3
1
48
3,889
One Nation will bring grocery prices down by helping Australia make more of what farmers need here at home. We would expand domestic fertiliser production, unlock affordable gas for manufacturing, remove net-zero policy barriers that drive input costs higher and back farmers to produce more food for less. More Australian production means lower prices at the checkout.
260
417
23
3,231
76,651
Halfway thru a job when we had 100mm over Couple of days, pit got to 1/2 full before a plug appeared! Then emptied quick! Time to build up a spill way, the ultimate hole that can hold water but never get full, now to discover the art of being able to find these holes for drainage
1
1
21
3,483
Aaron Liddell retweeted
Not sure if the clay trial strip makes me feel better or worse 🤨
9
8
73
7,756
Aaron Liddell retweeted
110mls in the last 7 days and it’s still dry 10mm below the surface.
7
6
75
8,324
Replying to @LiddellClaying
We are still seeing dry soil in control treatment at our North Stirling soil re-engineering site after 19mm in last 7 days & 28mm for June. Spaded treatments with varied clay rates moist.
2
1
4
478
Two sides of a laneway, 80mm rainfall in the last two days, one side 2cm damp and bone dry underneath, clayed stuff moist right thru.
3
7
1
32
10,699
Standing water on the unclayed, is a lot of drainage issues to be fixed with just holding the water where it falls.
5
421