NX Atomics (@NXatomics) header
NX Atomics (@NXatomics) profile picture

Power, redesigned. The next generation of nuclear is here, and it's lower-cost than ever.

USA
Joined July 2025
Photo by NX Atomics (@NXatomics)Photo by NX Atomics (@NXatomics)Photo by NX Atomics (@NXatomics)Photo by NX Atomics (@NXatomics)Photo by NX Atomics (@NXatomics)Photo by NX Atomics (@NXatomics)Photo by NX Atomics (@NXatomics)Photo by NX Atomics (@NXatomics)Photo by NX Atomics (@NXatomics)Photo by NX Atomics (@NXatomics)
We deployed ~$1M to explore a next-generation nuclear reactor concept in stealth. The results were strong enough that we decided to get serious. Now building: NX Atomics.
4
4
3
41
15,511
NX Atomics is excited to have been selected to present at the NSFA. The @bvvc_1776 team has been excellent to work with. Looking forward to it. 🇺🇸
1
2
456
VELA runs on liquid metal fuel, a uranium alloy that fills a spherical core. That design lets VELA burn up to 90% of its fuel, compared to about 5% in a conventional light-water reactor, which means more energy per pound of uranium and far less waste.
1
7
191
SMRs are the key to American energy independence
🇺🇲 The Pentagon wants every major US base able to run for 90 days cut off from the grid and outside supplies, with portable reactors, microgrids and stockpiles, and a two-supplier rule for its most critical parts The Pentagon is writing a new survival standard for American bases. Under a program called FORTRESS, every major military installation in the continental United States would be expected to keep essential operations running on its own for at least 90 days, including electricity, water, fuel and communications, Fox News Digital reported Sunday, citing documents it reviewed. "We don't want to rely on standard civilian municipal infrastructure to run our national defense. We just simply can't. It's an intolerable risk," Pentagon chief spokesperson Sean Parnell told the outlet. "Power is combat now." The plan reaches well beyond backup generators. Fox reports that FORTRESS envisions portable nuclear reactors, large-scale battery storage and microgrids that can cut a base off from the civilian grid. It calls for strategic reserves of munitions, fuel, critical minerals, electronics, spare parts and medical supplies, sized to how fast each is used up in a major war. For the military's most critical dependencies, it requires at least two qualified supply or production pathways, so the loss of one factory cannot stop operations. It also folds in the Civil Reserve Manufacturing Network, which would identify commercial factories that could switch to defense work in a crisis, with specifications, cybersecurity rules and contracts set in advance, plus recurring "industrial stress tests." Efforts to keep navigation and satellites working under GPS jamming are part of it too. FORTRESS itself is not new. Defense Secretary Pete Hegseth announced it on Sept. 30 (video below), promising that "every major military installation in America is going to generate its own power, independent of the civilian grid." On Oct. 6, acquisition chief Michael Duffey set up a FORTRESS America Program Office with Matt O'Malley, a nominee still awaiting Senate confirmation, as interim director. What Sunday's report adds is the 90-day bar, which goes beyond electricity to water, fuel and communications, and the two-supplier rule. Neither Fox nor DefenseScoop gives a cost, a budget line or a deadline, and Fox describes these as requirements in planning documents. The plan is a bet that a future war could reach the homeland through cyberattacks, sabotage or a broken supply chain, and a signal to industry. If funded, it points money toward small reactors, batteries, microgrids, stockpiles and second sources for parts now made in one place. "You don't want to be making these decisions in the middle of a global multi-front conflict," Parnell said.
2
3
613
NX Atomics retweeted
People seem to think nuclear energy is primarily a physics problem, but at its core (no pun intended) it's an economic one We've solved basic fission, the real challenge is making that cheap enough to be worth it Long term that's going to require more than just size and scale
33
5
2
95
5,206
You will live to see the atomic age.
1
4
1
19
2,336
It's time to properly introduced the people behind NX Atomics. Our board brings decades of experience across nuclear engineering, finance, law, and advanced manufacturing. Meet the lineup:
1
4
13
2,930
Dr. Jan Philipp Dabruck, CTO. Nuclear physicist with over a decade in reactor simulation, radiation safety, and advanced nuclear design. PhD from RWTH Aachen, European patent holder, and former head of Simulation & Safety at Dual Fluid. Leads our reactor platform development.
1
3
493
Stephan Gottlieb, Chief Engineer. Mechanical engineer with 30+ years spanning robotics, aerospace systems, and nuclear tech. Contributed to the Airbus A380 program, holds multiple patents, and lectures in mechanical engineering at the University of Applied Sciences Dortmund.
3
382
NX Atomics retweeted
Just recorded a podcast with @allie__voss and @AlexDVoss from @NXatomics. A fascinating new nuclear startup with this insanely great new generation reactor called VELA. Episode drops in 2 weeks.
1
2
1
8
3,227
NX Atomics retweeted
Solar and wind are not serious baseload providers. But @NXatomics is.
“Baseload” solar isn’t cheap, it’s the most expensive option on the grid. Our modeling shows that delivering 24/7 power with solar + storage can cost up to $600/MWh—nearly 10x more than natural gas. The reason? Massive overbuild + costly load balancing.
6
1
1
5
2,205
NX Atomics retweeted
Reads like an advertisement for @NXatomics
2
5
1,458
NX Atomics retweeted
As a nuclear nerd, I'm absolutely enamored with how quickly much of the industry is going As an energy policy nerd, I know that ultimately everything comes down to cost, and cost comes down to physics I think we're onto something here:
5
7
69
3,155
We can 3D print parts for airplanes and submarines, why not nuclear reactors? Our team recently visited @Sciaky_inc in Chicago to discuss using their EBAM technology for our developing SMR.
4
9
1,747
NX Atomics retweeted
Soooo despite living in Ohio we're actually launching in Indiana because Ohio is so behind the ball on nuclear power compared to basically all of its neighbors I really do hope that Ohio gets its act together, but for now we'll be building in the Hoosier state!
Is this all going down in Ohio?
24
10
2
214
13,942
NX Atomics retweeted
Can you 3D print nuclear reactors? We think so. I’m standing in front of an Electron Beam Additive Manufacturing (EBAM) machine, AKA high-tech metal 3D printing. Our plan is to use smarter SMR manufacturing techniques to drive down the cost of nuclear power.
60
52
21
497
23,454