π Site Update: Preproduction Foundation Testing for Solar Development
The local cattle served as our most dedicated (and silent) QA observers on site.
β οΈ Excavation gone wrong. This clip is a stark reminder of why soil conditions, site stability, safe excavating practices must be fully understood and implemented before work begins.
πΉ Credit: @branchingout β DM for attribution or removal.
π Weβre heading to RE+ Vegas! π
Catch the PRI Engineering team with our friends at @polarracking at Booth V8335.
π The Venetian Expo & Caesars Forum, Las Vegas
π
September 8β11
π Field to Lab β Quality in Every Load
PRI Engineering was on site at the Taylor Pit (City of Kawartha Lakes) sampling Granular A (Modified) during active crushing operations. This material is bound for upcoming roadwork projects across the city β and PRI is responsible for QC.
Why are subgrade inspections critical in construction?
This site was once a school parking lot. After removing the asphalt, the contractor uncovered a soft, unstable subgrade β a clear red flag for future pavement performance.
π Employee Spotlight: Sarah Beukeboom π
Read her story here: π priengineering.com/learning-β¦
Expert Onsite Construction Inspections β Built for Confidence.
π© Ready to partner with a team that understands performance and precision?
Reach out at [email protected] or visit priengineering.com
Cross Culvert Replacements in Action π§οΈ
Our team has been busy across several sites supporting culvert replacements β with technicians on site conducting detailed subgrade and compaction inspections at key stages:
On Site at Lake Dalrymple Bridge
Our technician was recently on site to perform concrete testing on the bridge foundation piles and the mud mat.