Shashank (@SBallaya) header
Shashank (@SBallaya) profile picture

El Psy Kongroo

Kalyan, MMR
Joined June 2018
Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)
Told you something was coming. 🧡 Introducing Mumbai Metro Tracker! 8 metro lines. Every station. Every fact marked as verified or reported, with sources. When does your line open? Find out 👇🏼 mumbaimetrotracker.com #MumbaiMetro #MMR
New address, same obsession with Mumbai's metro network. 👀 Now at mumbaimetrotracker.com Something's coming soon. Stay tuned! 🧡
20
25
6
140
8,477
Found this Paris tourist map during Diwali cleaning, along with a Metro-Tramway Transit map. Now I’m tempted to create one for Mumbai and add it to mumbaimetrotracker.com as a printable PDF. A full-circle moment. 🥹
14
268
Shashank retweeted
Don Toliver leads all rappers with 5 nominations at the 2027 #GRAMMYs 🚨 🏆 Best New Artist 🏆 Best Rap Album 🏆 Best Rap Song 🏆 Best Rap Performance 🏆 Best Melodic Rap Performance
72
379
201
3,461
101,204
Damn
While we were focusing on other things, RITES Ltd. silently invited bids in October for geotechnical investigation work to prepare the Detailed Project Report (DPR) for connecting Thane High Speed Rail Station with Thane Integral Ring Metro and MMRDA Metro Line 12 at Sonarpada.
3
11
245
Shashank retweeted
Thane Integral Ring Metro Project. Pier cages have been installed near Wagle Circle, in front of the Oriana Business Park. Work is going on at a good speed. Barricade installation is underway toward Lokmanya Nagar and Wagle Circle both.
6
10
2
114
4,965
Metro 5 wild card entry 😂😂😂 Ignoring the fact that tenders for the remaining stretch of Line 5 have only just been floated, the trials are happening on the halfcompleted stretch.. Waise toh Line 2 is also complete, and Line 4 is almost there. 🤦🏻‍♂️
Who will win the title of Mumbai's most delayed Metro project? Well, there appears to be a race between Green Line 4 (Wadala–Thane) and Pink Line 6 and (Swami Samarth Nagar–Vikhroli) and none of it seems to be in a hurry! And Orange Line 5 (Thane-Bhiwandi-Kalyan), on the other hand, seems to be the wild card entry getting completed the fastest. A detailed report
4
3
28
1,754
A few UI changes here and there! Updated the header section and made some improvements to the maps, including detailed animations for operational metro lines. Recorded this clip on my old Nikon point-and-shoot to give it that retro feel. 📸
2
1
23
430
Shashank retweeted
Thane Ring Metro Construction of Piers have started near Wagle Circle. Won't be surprised if Ring Metro Phase 1 is completed gets completed before entire Mumbai Metro 4 line is operational. Good pace of Soil testing from Raila Devi station to Lokmanya Nagar Depot Station
6
5
1
75
2,088
Metro 2B: The Andheri West–Saraswat Nagar stretch (7.53 km) is targeted to open by March 31, 2027. The last 3 girders near Juhu Circle are scheduled to be launched by Nov 18 @TOIMumbai
2
14
1
135
4,981
Mumbai had its real life moment akin to Arvind Adiga's novel Last Man in Tower. The difference: unlike the building being redeveloped in the story, this one's being demolished to make way for metro. More on this by @sabahvir share.google/oCMnbsClmZal8PG…
3
4
1
30
1,935
Dairy Don has opened at Sai Chowk, Khadakpada.
Chaayos has opened near Vasant Valley.
3
1
20
826
Who will win the title of Mumbai's most delayed Metro project? Well, there appears to be a race between Green Line 4 (Wadala–Thane) and Pink Line 6 and (Swami Samarth Nagar–Vikhroli) and none of it seems to be in a hurry! And Orange Line 5 (Thane-Bhiwandi-Kalyan), on the other hand, seems to be the wild card entry getting completed the fastest. A detailed report
76
119
17
665
55,591
Shashank retweeted
Mumbai Metro Line 2B and 4 Interchange Point. Pic 1 - Siddharth Colony Metro Station ( Line 4) Pic 2 & 3 - Interchange Section between 2B ( EEH) and Line 4 ( Siddharth Colony) Difference between 2B and 4 at this Section is too Vast. @Sahilinfra2 @Maha7Arindam @SBallaya
4
5
1
68
4,486
Shashank retweeted
Mumbaimetro l5 Trains entering kasheli depot & parked there 📹Durga chauhan
4
31
2
376
9,712
From my experience in the industry, the decision is usually left to the authorities and the government in charge at the time. But it also depends on precendence. MH, for example, went with 25 kV AC OHE for Mumbai, Nagpur and some lines of Pune, because it already had decades of experience dealing with electrified overhead rail networks in tunnels (think Mumbai Suburban, bhor ghat and thul ghat), on top of that it saves crores on land acquisition as fewer transformers are required (and thus fewer acres to be acquired for multiple transformers every few km) and 25 kV AC, at least we believe, can be easily integrated with the grid than third rail. But Bangalore chose 750 V DC third rail as they concluded that saving costs on tunneling is more important than saving land acquisition costs for multiple transformers as third rail TBM based tunnels are much smaller in diameter and can be built for a cheaper price per km. Hence they chose third rail. Pune Line 3's choice to choose third rail is a total wild card (and a REALLY stupid one if you ask me). They chose third rail cause...... and I kid you not..... "✨muh aesthetics✨" yeah, they chose third rail cause they're aesthetics ke chode. 🤦‍♂️🤣 The other official reason of protecting from birds and kites never made sense to me because systems like Mumbai and Delhi have birds and kites too but they never had to choose third rail over this.
How does a city decide whether its metro gets electricity from wires on top (like Mumbai) or from somewhere down near the tracks with no wires at all (like Bangalore)? Photos: Sameer2905, Mumbaimetro / Wikimedia Commons (CC BY-SA 4.0)
3
20
569
Shashank retweeted
The Mumbai skyline remains striking Last day in Mumbai 😭😭😭 brings a sense of missing it for another year.
1
2
93
After almost a year, work has resumed on the Palms Water-Vitthalwadi connector bridge on the Kalyan West side. This comes after the Line 5A alignment was clarified in the tender documents released following last week’s announcement.
Soil testing suddenly started near Palms Water. Could be the Kalyan East West Connector design changing to fit the Metro 5 extension alignment. Either way, first movement after a year of silence on Kalyan West
3
3
45
1,419
Shashank retweeted
Introducing Claude Meetings: add Claude to your team’s video call and it builds docs, whiteboards, and other artifacts with you while you’re still talking. Starting to roll out in beta on Team and Enterprise plans.
2,327
5,162
5,404
81,276
10,086,058
Shashank retweeted
Mumbai Metro line 5. Today during trials, two BEML rakes entered Kasheli Depot for the first time. Ballasted Track work has started in the depot. (PCRO)
10
20
1
188
6,399