Our last commissioning activity, involving spectrometer pointing and detector setup, will be done tomorrow.
4
Spent most of the day catching up with the SPIRE project accounts, normal work doesn't stop for commissioning!
Taking a day off, second Saturday i've managed to take off since launch, have to work tomorrow though.
In Orbit Commissioning Review kick off meeting started at 9.00 this morning, at 19.30 took a break for some champagne.
We've had two very good days completing the last spectrometer functional tests. This is our last trip to Germany for real time commanding.
Our second set of spectrometer scans were done on the 10K cooler telescope on Friday, the temperature difference is used for calibration.
The first SPIRE images have now been produced, they are quite stunning. We should be able release these within the next few weeks.
Later this week we plan to repeat this observation and use the two different telescope temperatures to characterise the spectrometer.
The first look outside by SPIRE was done on Friday where we took a spectrum of the still warm telescope looking at a dark piece of sky.
We spent most of last week diagnosing and recovering from a problem. SPIRE is now back to fully working.
The crocover has opened sucessfully, PACS have the first look outside today, SPIRE will have first light tomorrow.
After the final set of tests with the cryostat lid on SPIRE has been formally declared ready for the lid opening tomorrow.
We're now analysing our first observations using spacecraft pointing, we expect first light Monday night after the cover comes off on Sunday
Not much happening with SPIRE at the moment, our first observations using spacecraft pointing will be this week.