Westminster Dept. of Public Works (@WestminsterDPW) header
Westminster Dept. of Public Works (@WestminsterDPW) profile picture

Official Twitter Account of the Westminster Department of Public Works

2 Oakmont Ave, Westminster MA
Joined July 2015
A Public Hearing will be held by MassDOT to discuss the proposed rehabilitation & box widening on Route 140. It is scheduled to take place on 2/5/2020 at 7:00PM in Room 205 of the Westminster Town Hall; at 11 South Street, Westminster, MA. Learn more here: https://teapawt.org/t.co/RpY7v8NYfo
1
The Westminster DPW is currently working to repair a water main break between 3 Main Street and 32 Main Street today, 1/7/2020. Crews are working diligently to have the main repaired and water service returned as soon as possible. Learn more by visiting: rb.gy/sfhm3m
1
The Westminster DPW is currently working to repair a water main break at 182 Main Street today, Tuesday, December 10, 2019. Crews are working diligently to have the main repaired and water service returned as soon as possible. Learn more by visiting: https://teapawt.org/t.co/rIkjvUPK1Z
1
If you must travel in your vehicle during a snow event, be sure to drive slow and use caution on the road. Stay connected this season, visit the Westminster Emergency Preparedness webpage and register for municipal news, alerts, and announcements: https://teapawt.org/t.co/PHQFdqnbGE
1
The National Weather Services has issued a Winter Storm Warning in effect from 11:00 AM today (Sunday, December 1, 2019) through 7:00 AM on Tuesday, December 3, 2019. The snow could be heavy at times. For your safety and ours, please give us some space and let us do our jobs.
2
4
The Patricia Road Culvert Replacement is Scheduled to Begin on Tuesday, November 19, 2019 – Expect Delays and Plan Ahead for Travel. For more information, visit: westminster-ma.gov/departmen…
When it rains, dog poop and other pollutants are carried over our sidewalks and roads into the nearest storm drain where they flow directly into our nearest water body. Help us prevent stormwater pollution in Westminster, get the scoop by visiting: westminster-ma.gov/stormwate….
Vegetation helps reduce stormwater runoff, and autumn is a great time to take a proactive approach to begin nourishing your lawn. Learn more about preventing stormwater pollution in Westminster: westminster-ma.gov/stormwate…
1
1
Did you know that grass clippings left on the lawn do not cause thatch? Nitrogen-rich grass clippings are 80-90 percent water and break down quickly to feed the soil. For more information about preventing stormwater pollution in Westminster, visit: westminster-ma.gov/stormwate…
When preparing for the winter months, be sure to keep any road salt or deicing material stowed safely in a weather-proof location to lessen the chance of potential groundwater contamination. Learn more about preventing stormwater pollution: westminster-ma.gov/stormwate…
1
With Fall in full-effect, you can do your part to make a positive impact too. Keep sidewalks, curbsides and stormwater drains clear by raking leaves and disposing them into yard waste or compost bins. Learn more about Stormwater Management by visiting: westminster-ma.gov/stormwate…
Bathrick Road will be closed to thru-traffic on Monday, 9/30/2019 and Tuesday, 10/01/2019 for fine grading and compaction in preparation of road-paving operations. Learn more by visiting Westminster-ma.gov: rb.gy/fa62cc
Westminster is required to implement an Illicit Discharge Detection and Elimination Program to ensure that all discharges to and from the municipal separate storm drainage system are either permitted by the Mass. DEP or eliminated. View the Town's IDDE: https://teapawt.org/t.co/ODAcW7ahv4
The First Day of Autumn is on September 23, 2019. Keep in mind that fallen leaves can plug storm drains, flooding our roads and harming our local waterways. For more information about what you can do to prevent stormwater pollution in Westminster, visit: westminster-ma.gov/stormwate…
The Westminster Highway Department has completed the installation of the rip-rap along the slopes of the causeway on Whitney Street.
3
On Monday, September 16, 2019, the Highway Department is anticipated to begin installing rip-rap along the slopes of the causeway on Whitney Street. Due to the use of one-way alternating traffic to facilitate the work, delays are expected. Learn more: https://teapawt.org/t.co/1Sdgnu3tNT
Road resurfacing operations are scheduled for Willard Road on Tuesday, September 10, 2019 and a portion of West Princeton Road on Wednesday, September 11, 2019. For more information visit: westminster-ma.gov/home/news…
Updated - Weather permitting on 9/9/2019 Shady Ave. will be closed to thru-traffic for road resurfacing operations during the morning hours. In the afternoon the paving operations will relocate to Bragg Hill Rd. Seek an alternate route of travel. For info: westminster-ma.gov/home/news…
Weather permitting, Shady Avenue will be closed to thru-traffic for road resurfacing operations on Friday, September 6, 2019 and Monday, September 9, 2019. For more information, visit: https://teapawt.org/t.co/7FV5ulAMhq
Weather permitting, Shady Avenue will be closed to thru-traffic for road resurfacing operations on Friday, September 6, 2019 and Monday, September 9, 2019. For more information, visit: https://teapawt.org/t.co/7FV5ulAMhq
The Bragg Hill Road Culvert Replacement Has Been Postponed Until Tuesday, August 20, 2019 - Weather Permitting. For more information: westminster-ma.gov/home/news…