Site planning and preliminary engineering is beginning at our Union County Campus in El Dorado, Arkansas, where approximately 8 MW of utility power is available today. We’ve engaged A2 Advisors to lead site development and leasing strategy for the campus.
Full release: nasdaq.com/press-release/z-s…
$ZSQR
The AI conversation used to be about chips. Increasingly, it's about power.
Chips can be ordered. Grid capacity has to be planned, permitted, built, and connected, and in many markets that process takes years. New data center campuses can sit in utility queues while demand for AI capacity keeps growing.
That gap is the reason Z Squared exists. Instead of waiting in line for new power, we start with sites where power is already flowing and convert them to AI-ready capacity.
Lead with power. Build with speed. Scale with discipline.
The AI conversation used to be about chips. Now it's about power.
Chips can be ordered. Grid capacity has to be planned, permitted and connected, and in many markets that takes years.
That gap is why we start with sites where the power is already on. $ZSQR
AI demand comes in two shapes, and both run on power.
Training is how a model learns. It means large, concentrated jobs running on thousands of chips for weeks.
Inference is the model doing its job: answering questions, recognizing images, running agents. Each request is small, but the volume grows with every user and every new application.
Both need the same foundation: energized power, cooling, density, and connectivity. That's the capacity Z Squared is built to deliver, with AI and high-performance computing as our target workloads.
AI demand comes in two shapes.
Training: huge, concentrated jobs to build a model.
Inference: answering requests all day, growing with every user.
Both need energized, cooled, connected capacity. Our target workloads are AI and high-performance computing. $ZSQR
"Energized" and "AI-ready" aren't the same thing.
An energized site has power flowing. An AI-ready site adds everything modern AI workloads need on top of it:
• Cooling, with a path from air to liquid as rack densities climb
• Density: racks that draw far more power than typical enterprise servers
• Fiber: fast, redundant connectivity
• Physical security and monitoring
• Operations staff and remote hands on site
At Z Squared, power comes first. Everything else is engineered to the workload.
#AIInfrastructure #DataCenters #LiquidCooling
What turns an energized site into AI-ready capacity?
Cooling, with a path from air to liquid
Density: high-power racks
Fiber: fast, redundant connections
Security and monitoring
Operations people on site
Power comes first. The rest is engineered to the workload.
Our model in one line: your compute, our everything else.
Customers bring the GPUs, servers and workloads. We deliver the power, cooling, density, fiber, security, remote hands and operations underneath them.
We don't build the compute layer. We build what it runs on. $ZSQR
Two ways to bring AI capacity online:
Greenfield: find land, request a grid connection, wait. Queues for new data center campuses can run 3 to 5 years.
Acquire and convert: buy a site that's already energized, then re-engineer it for the workload.
We chose the second. $ZSQR
A closer look at our Union County Campus in El Dorado, Arkansas.
It has about 8 MW of existing interruptible service from Entergy Arkansas today, and a development target of up to 150+ MW that isn't contracted or energized yet.
This is where our conversion work starts. $ZSQR
Interruptible vs. firm power, in plain English:
Firm: the utility commits to deliver it around the clock.
Interruptible: the utility can curtail it when the grid is stressed.
AI workloads generally need firm, redundant power. That's why we call our ~8 MW a starting point.
The scarcest thing in AI is not chips. It is power.
Z Squared ($ZSQR) is built around that idea. Here's what we do, what we own today, and what we're working toward.
What we own today: Union County Campus in El Dorado, Arkansas. We closed the acquisition on Sept. 8, 2026.
The site has about 8 MW of existing interruptible Entergy service. That's a starting point, not AI-ready delivered capacity.
In 2018, Gartner predicted that by 2025, 75% of enterprise data would be created and processed outside a traditional data center or cloud, up from about 10%.
Wherever the exact number landed, the direction holds: more data is created far from any data center.
1. A sensor captures data: a camera frame, a temperature, a vibration.
2. A nearby computer processes it within milliseconds. 3. The system acts right away: flag, stop, alert, adjust.