I’m not normally one to give government bad ideas, but it might be time to sandfill the water around National Theatre and build a >500 room convention centre type hotel in that place.
Technically, the design and fabrication of pressure vessels is a very niche, highly regulated operation.
Who does that in Nigeria? Who is certifying them for operation? Who is doing their annual inspections? Where is the insurance for them?
These pressure vessels designed by unqualified artisans are in all our petrol stations, gas vending stations, and on most “petrol tankers”.
These are all putting lives and properties in jeopardy. The result of which we see time after time like this video, daily tanker leakages etc.
Administratively, This is the result of lack of and non-adherence to town planning.
It is costing us human life, infrastructure planning, quality of life, monetary losses etc.
How is someone allowed to build an highly explosive and toxic flammable in “agbole” where children are sleeping next door?
The disaster is not a question of if but a question of when.
There should be a law banning the development of these businesses within residential areas.
2
318
Cost and cost overrun
Endemic corruption
Bureaucracy
Mismanagement
Transmission infrastructure gap
Technical expertise
Leadership short sightedness
Lack of ambition
Poverty
Poor regulatory oversight
Illiquidity
Metering challenges
Security
Fuel supply constraints
Safety concerns
Waste management
Maintenance and services
Local supply chain
“Manage am” mentality
Need more?
Interesting!
To say, that $2.5B investment will increase transmission capacity from 4GW to 40GW is factually and technically incorrect.
$63k/MW? My estimate - each GW of transmission capacity will cost ~ $1B .
Watched this podcast couple of months ago, while his experience is non-debatable, what I saw is intellectual arrogance, self-aggrandizement and the typical larger-than-thou mindset.
This is what I mean about the trivialization of electricity development issues in Nigeria.
Replying to @aboyspeaks @FunsoAkinsanya
Former MD of TCN, Usman Gur Mohammed, stated it would cost $2.5 billion to make the necessary upgrades to raise the transmission capacity of the Nigerian national grid to 40,000MW.
That is an amount that can be easily funded by the federal budget.
youtube.com/watch?v=FD2SJ7HR…
Aside telecom, mention a single infrastructure in 🇳🇬 that offers a sustained value equivalent to 20hrs of electricity supply?
Water supply? Healthcare? Road? Rail? Education? Security? Telecom? Gas? Waste? Waste water? Community centres? Water transportation? Sport?
Power is just the most visible infrastructural failure in 🇳🇬. You cannot hide blackout.
Electricity Accessibility ≠ Availability ≠ Reliability ≠ Quality.
Over time, the focus of electricity development in Nigeria has always been centred around Accessibility and availability. With the latest strides, reliability is starting to be part of the conversation.
Okpai, Geometric Power, Azura, Afam, TransAfam FastPower are the only power plants build by private entities representing <15% of installed capacity
The rest, including all hydro, NIPP were financed & built by the government.
Transmission is solely govt. All investment in this sub-sector is from govt including SCADA and new SSs.
Distribution base infra has been assets developed by the govt.
Metering have been mostly financed, guaranteed and reformed by govt through PMI, NMMP, DISREP and MAF programs
Govt has spent trillions on the sector since privatization.
How much more should govt take on before the private sector to take charge?
Except for financing Hydro, private capital needs to flow into transmission and distribution.
The US midterm elections were decided by the cost of food and gas.
Affordability or handouts, “Stomach Infrastructure” is key to winning elections.
One is the cost of rice, the other is free rice.
4
250
The reason Nigeria does not have 24hrs electricity is the same reason Nigeria has 3 government-owned refineries that barely refine a litre of crude.
Corruption is not a problem. It is the PROBLEM…..it renders every policy intervention useless and makes all technical solution fail.
$2B East-West Super Grid - another election promise?
Uncle Tegbe announced the approval & commencement of procurement for the EWSG with a 24-month project cycle. Laudable idea but this is just another election promise and here is why:
Procurement: Uncle T did not mention what is being procured. Surely not equipment procurement because Engineering Design has not been done. Maybe procurement of consultancy services for the procurement.
Timeline is unrealistic: 24 months to develop, design, procure, and construct. Neither the EIA for the project nor the RoW has been completed. These are major showstoppers for transmission project
Capacity: manufacturing timeline for 15GW-capacity transmission equipment (transformers, conductors, Reactors, protection systems ) will take the whole 24 months of not more. This project cannot be completed in 24months
The 19GW transmission capacity target (4x) is unrealistic within the timeline especially in a country that has not added 4GW in last 10years!
Where is the generation source of the matching 15GW within 24 months? It isn’t feasible. This is even contradictory to APC’s manifesto targeting 10GW by 2031.
Finally, $2B will not build a 15GW transmission line. What is the planned total project cost?
My conclusion: This project is just an idea at this point, nothing more!
APC Manifesto!
2023 - 2026: 4.2GW daily generation, 60% metering, NESI reforms & solar DER development. My score for overall delivery- ~40%
2027 - 2031 goals: 7.5GW avg daily generation, increasing daily energy by 75+% to 180GWh
ATC&C losses to 16% & 8M meters.
First time seeing a “SMART” goal in the NESI. Quite refreshing.
I expect a more ambitious generation goal but it seems they are playing it safe perhaps because they believe that 2027 is sure for PBAT. I like the realism.
Finally, the manifesto does not mention transmission goals.
With last week’s electricity wahala, elections coming, I expect PBAT campaign team to double down on electricity “propaganda”!
1
2
226
Blackout in major parts of Nigeria
MoP - it is Egbin, Gas & transmission
NISO - Na Gas constrain
NNPC/NGC - Hey! Hey! Gas Dey! 😀
NERC - Mute 🤐
GENCO - Mute 🤐
How else do we proof lack of coordination in NESI?
PRESS STATEMENT
NNPC confirms Gas Supply & Network Availability
NNPC Limited confirms that gas transportation network operated by its subsidiary, NNPC Gas Infrastructure Company Limited (NGIC), remains available to support deliveries to power generating stations Nationwide without any constraints. NGIC’s operational records do not indicate transportation-related constraints within its network that explain the current decline in electricity generation.
Read the full press statement when you visit nnpcgroup.com/insights/press…
#EnergyForToday
#EnergyForTomorrow
Planned maintenance, gas supply constraint & transmission line sabotage caused electricity supply disruptions.
If these risks are known why did NISO approve outage at Egbin without requisite supply backup?
Policy alone changes nothing. Clinical execution and technicality does.
Despite the grandeur ambitions and political showmanship in the NESI, the ultimate priority for NESI is to secure the reliability &availability of our current available.
The scorecard for today is F!