Daryl DC πŸš…πŸš‡πŸš‘πŸš (@daka_x) header
Daryl DC πŸš…πŸš‡πŸš‘πŸš (@daka_x) profile picture

πŸ‡¨πŸ‡¦πŸ‡΅πŸ‡­ ENTP, he/him. Enthusiastic about cities, housing, and transit. Founder, @SkyTrain4Surrey οΌ‹ Co-Founder, Build the #SFUGondola.

Surrey, British Columbia
Joined May 2012
"Network Southeast" by @MovementYVR is a blueprint for #SurreyBC's future transit systemβ€”designed by transit riders for transit riders. I am pleased to have worked closely with fellow advocates to design the proposed routes! πŸ™‚ movementyvr.ca/release-trans… #surreypoli
2
1
14
1,157
Amazing to see sizable high rise residential projects coming up along the Surrey Langley SkyTrain stations! This proposal adds two 30+ storey high rises and over 700 new dwellings within metres of the entrance to the new Green Timbers Station. #buildSLS #vanre #SurreyBC
Surrey council will vote on two Whalley residential highrise proposals following a public hearing set for 7 p.m. Monday, November 23 at City Hall. surreynowleader.com/2026/11/…
3
248
Daryl DC πŸš…πŸš‡πŸš‘πŸš retweeted
The lesson is not just to give existing LRTs transit signal priority. It’s to stop building at-grade transit. We are not mature enough to operate at grade transit in Toronto. At the cost to make this a half-tunneled LRT-Subway Frankenstein we could have just gone elevated with a proper metro technology.
9 months after opening, Line 5 Eglinton LRT is still waiting for left turning cars ahead of it, causing 30 seconds of delay. Now imagine how these delays compound over a dozen intersection it crossed through. Mayor Chow and the new TTC board have to make solving this a priority
21
15
1
242
9,855
Daryl DC πŸš…πŸš‡πŸš‘πŸš retweeted
COMPARING SKYTRAIN TO NEWTON TO TRANSLINK'S KING GEORGE BLVD BRT - Completion of Newton SkyTrain possible in 2032-2035 - BRT from Newton to S. Surrey only could be 1/3 cost - Significant misinformation on timelines, costs #surreybc #vanre #translink skytrainforsurrey.org/2026/1…
1
1
3
370
Daryl DC πŸš…πŸš‡πŸš‘πŸš retweeted
Sydney Metro West is going to be a step up for Metro in Sydney: πŸš‡ Longer carriages 21.49m (up from 20.25m) πŸš‡ Wider trains 3.2m (up from 3.05mm) πŸš‡ 4 doors per carriage (up from 3)
12
6
1
122
6,152
SimCity 4 is back baby
Traffic somewhat works in Isometric Vancouver now! Currently training an image model so I can expand the city for cheaper.
3
326
City of Surrey roadworks appears to be adding a new right-turn lane on 104 Avenue eastbound to King George Boulevard southbound! This alone is a huge win and a game-changer for Guildford transit riders, massively reducing delays on the 320/337/501/509/R1 buses. #SurreyBC #vanre
92
I need to say it b/c it won't be said, but @TransLink and developer @onnigroup's FAILURE to integrate the Gilmore Place development with Gilmore SkyTrain Station (which was designed for platform integration) exacerbated the fire and the ensuing service disruption. #bcpoli #vanre
6
1
6
4,261
An arsonist has less chance of getting into the area and starting a fire of this magnitude if there are more PEOPLE around, which there WOULD be if TransLink and Onni had properly connected the development and the station β€” BUT THEY DIDN'T! So this place is always a ghost town!
1
1
419
I also blame the @CityofBurnaby because better oversight would have ensured that the development and the station actually connected. Others show us how to do better: Surrey made efforts to ensure the future 152 Street Station connects with future developments across the street.
1
345
I think @RM_Transit would want to see this
Platform screen doors are so important in Korea that even when the doors are broken, they have a backup system that can block the tracks
3
2,121
Daryl DC πŸš…πŸš‡πŸš‘πŸš retweeted
Not to flex but... #GalaxyZFold8
3
2
18
2,483
Daryl DC πŸš…πŸš‡πŸš‘πŸš retweeted
We'll let you connect the dots... #GalaxyZFold8
2
3
1
24
3,355
Sydney Metro opens another extension of its wildly successful driverless rail system modelled on SkyTrain! The Bankstown line extends 20km from downtown (same distance as Waterfront-New Westminster) + the existing Northwest line is 46km (longer than Waterfront-Langley City!)
The Bankstown railway line reopened today after a 2-year closure to convert the line for automated trains, as an extension of the Sydney Metro M1 line. It was fun to ride on the line again today and to see its upgraded stations.
5
496
Daryl DC πŸš…πŸš‡πŸš‘πŸš retweeted
Six days after Sydney's new airport opened, the 13km @SydneyMetro extension opened to Bankstown. Today would have been a very satisfying day for Transport for NSW executive @HowieCollins.
4
6
2
41
3,507
Daryl DC πŸš…πŸš‡πŸš‘πŸš retweeted
It only takes 80 minutes on the Sydney Metro from Bankstown to Tallawong using the new Southwest Metro. That's 31 stations and 66kms travel. An average speed of 49.5km/h including station stops! That is quick πŸš‡ #SydneyMetro
6
12
2
155
18,497
Daryl DC πŸš…πŸš‡πŸš‘πŸš retweeted
BC NDP showed #SkyTrain extension projects are good politics. With that in mind, Lorne Doerkson's Conservatives should think bigger by providing strong provincial leadership and direction in long-term planning. #bcpoli #vanpoli #vanre dailyhive.com/vancouver/bc-n…
7
7
4
56
10,726
😒
In lieu of flowers, memorial contributions may be made to: Johns Hopkins Alzheimer’s Disease Research Center Fund Β Β  alzresearch.org/giving/ Alzheimer’s Foundation of America Caregiver Resources Β  Β  alzfdn.org/donate/ Photo Credit: Tommy Garcia
1
51