
ALT Letter dated 2 November 2026 from Jeremy Varns, Campaign Coordinator of SWR Watch, addressed to Zöe Franklin MP to forward to Transport Secretary Heidi Alexander regarding SWR weekend services during engineering works on the Portsmouth Direct line (31 Oct - 1 Nov). The letter outlines key failures on Sunday 1 November, including: Intermediate stations left with up to 5-hour service gaps. First Travel Solutions attempting to recruit sub-contractors less than 36 hours before operations began. Timetable updates delayed until late Saturday night/early Sunday morning. Reports of small vans replacing entire trains, raising accessibility and capacity concerns under PSVAR. Station staff reportedly instructed not to book taxis for stranded passengers, with help points routed to National Rail Enquiries who lacked information. Complete lack of local bus ticket acceptance notices on JourneyCheck or the SWR website despite claims of a "good service."

ALT Page 2 of the letter from SWR Watch to the Transport Secretary. Includes a data table from ORR passenger rail usage figures (2016/17 to 2025/26) comparing London operators: Southeastern: -20.1% vs 2019/20 (+4.0% YoY) c2c: -16.4% vs 2019/20 (+6.1% YoY) South Western Railway: -15.6% vs 2019/20 (+3.8% YoY - lowest growth among peers) Chiltern: -15.0% vs 2019/20 (+5.3% YoY) GTR: -9.4% vs 2019/20 (+6.0% YoY) GWR: -3.4% vs 2019/20 (+5.3% YoY) London Overground: +2.0% vs 2019/20 (+5.3% YoY) Greater Anglia: +3.6% vs 2019/20 (+7.6% YoY) Lists 6 specific questions for the Secretary of State regarding SWR's contract transparency, DfT replacement spending caps, taxi booking restrictions, accessibility compliance, minimum standards, and passenger-growth targets. Concludes with a request for a formal meeting between DfT representatives, SWR Watch, and affected passengers. Signed by Jeremy Varns.




















