Sub Div Ist Project Left retweeted
Replying to @diprjk
@diprjk @AshwaniKumar_92 @ErAaquibSWDeva @kpdcloffice @pddjkofficial Shri Ashwani Kumar, Financial Commissioner (ACS), visited GSS Alustang to review two key transmission projects: 1.Augmentation of the station from 320 to 475 MVA and the
2. Proposed 400 kV D/C Alustang–Leh 1/2
Sub Div Ist Project Left retweeted
Eid Mubarak✨
May this blessed Eid fill every home with happiness, every heart with peace, and every prayer with acceptance. Wishing the people of Kashmir a day of togetherness, gratitude, and countless moments with loved ones.
#EidMubarak #Kashmir #EidUlAdha
Sub Div Ist Project Left retweeted
PREPAID E-SERIES CONSUMERS ONLY
Facing login or registration issues on the SmartBSPlus app?
You can still recharge your prepaid electricity meter through the Quick Pay option, fast, simple, and hassle-free.
Watch the video and follow the easy steps to complete your recharge.
#SmartBSPlus #PrepaidMeter #ElectricityRecharge #QuickPay #kpdcl
Sub Div Ist Project Left retweeted
Replying to @diprjk
@diprjk @AshwaniKumar_92 @ErAaquibSWDeva @kpdcloffice C.E JKPTCL Kmr. accompanied by S.E O&M Circle-II paid a visit to 220/132/33 kV GSS Alustang in connection with the proposed augmentation of the said GSS from 320 MVA to 475 MVA under the Capex Budget 2026–27 . 1/2
Sub Div Ist Project Left retweeted
Pole erection underway at Feeder Choon Kulbugh, Sub-Division Budgam (ED Budgam) under the Revamped Distribution Sector Scheme (RDSS) for loss reduction.
100 sqmm ACSR stringing in progress at Midoora Lalgam Feeder, ED Awantipora.
#PowerInfrastructure #RDSS #JammuAndKashmir
Sub Div Ist Project Left retweeted
Powering homes, step by step ⚡
From consumer meter installation at Chek Hatharan, Soibugh to cable stringing in progress at Nagam Feeder, Sub-Division Chadoora.
our teams are on the ground, working with dedication to strengthen reliable electricity for every household.
Progress today for a brighter, better tomorrow.
#PoweringProgress #OnGroundWork #ReliableElectricity #InfrastructureInAction #Kashmir #Development
Sub Div Ist Project Left retweeted
DC Budgam @DrBilalbhatIAS reviewed power infrastructure works under RDSS with KPDCL. Progress includes 22,863 poles erected, 43 km of 11 KV lines, 850 km LT AB cabling & 92 DTRs installed. Directed fast-tracking for reliable power supply.@diprjk
Sub Div Ist Project Left retweeted
Power Supply Status – Kashmir (as of 04:22 PM)
• 33 kV Feeders: 135 UP (100%)
• 11 kV Feeders: 1234 UP (94.41%)
• Total Load – Kashmir: 1722 MW
Due to heavy snowfall across several parts of Kashmir, system load remained subdued during the initial hours. With weather conditions easing and restoration measures taking effect, the load has gradually picked up and the grid is now operating in a steady and stable state.
Sub Div Ist Project Left retweeted
Snow may slow the roads, but it never stops the resolve.
At Ashtangoo and Nadihal, restoration work continues with unwavering dedication, ensuring power reaches every home; No matter the conditions.
Sub Div Ist Project Left retweeted
When winter tests resilience, commitment answers back.
Restoration of feeders underway at ESD Sopore 3rd
our teams standing firm in snow and silence to keep the lights on.
Service before comfort. Power for every home
Sub Div Ist Project Left retweeted
Power Supply Status – Kashmir (as of 11:14 PM)
• 33 kV feeders: 129 UP (96%)
• 11 kV feeders: 1169 UP (89.44%)
• Total Load – Kashmir: 1660 MW
Restoration efforts have brought the grid close to full stabilisation across the Valley.
Sub Div Ist Project Left retweeted
Amid challenging snowy conditions, restoration work is steadily progressing at Village Shumnag Muqam, ED Budgam. Ground teams remain on site, ensuring power supply is restored safely and efficiently.
Sub Div Ist Project Left retweeted
Power Supply Status – Kashmir (as of 06:00 PM) (25-01-2026)
• 33 kV feeders: 135 UP (100%)
• 11 kV feeders: 1240 UP (94.87%)
• Total Load – Kashmir: 1613 MW
Power supply is largely restored, with the network approaching complete stability across Kashmir.
Sub Div Ist Project Left retweeted
Challenging terrain. Severe weather. Unshaken resolve. Restoration efforts on the 11 kV Waltengoo Kund feeder under ESD Qazigund are in full swing.
#Restoration
Sub Div Ist Project Left retweeted
Not all heroes wear capes; some carry ladders & tools.
Linemen from STD Ganderbal & STD Bijbehara show unmatched courage, wading through floods to keep homes powered.
Sub Div Ist Project Left retweeted
MD KPDCL reviewed ongoing power prep for #AmarnathYatra2025 at Pahalgam, joined by CE Distribution, SE South, and field teams.
✅ 24x7 supply readiness
✅ DG sets & solar lights in shadow zones
✅ Underground cabling at Nunwan Base
✅ Buffer DTs, fuel stock & standby teams
MD appreciated teams working in tough terrain, ensuring seamless power for pilgrims.
This Yatra is a collective duty
KPDCL is fully committed.
#Kashmir #PowerForYatra #KPDCL #AmarnathYatra
Sub Div Ist Project Left retweeted
⚡No Disconnection Worries!⚡
During our ongoing payment system upgrade, no disconnections will be made for non-payment of electricity bills.
Your power supply remains uninterrupted.
Thank you for your continued trust and patience.
📞 1800 1807 666
#KPDCL #PublicNotice
Sub Div Ist Project Left retweeted
"MD, KPDCL reviews Revenue Realization, RDSS progress, PM Surya Ghar Scheme & measures for seamless Power Supply in the holy month of Ramzan during his visit to South Kashmir."
@diprjk @OfficeOfLGJandK @nasirsogami @cekpdcl @GreaterKashmir @RisingKashmir
Sub Div Ist Project Left retweeted
#RDSS
#Progress
Spike earthing in progress at Hajibagh feeder of #ESD📍 Narbal,ED Budgam under the Centre's premier loss reduction scheme of #RDSS: #KPDCL
@diprjk @MinOfPower @OfficeOfLGJandK @nasirsogami @GreaterKashmir @RisingKashmir
Sub Div Ist Project Left retweeted
#RDSS
#Progress
Cable stringing in progress at Hayatpora feeder of #ESD📍 Charisharief, ED Budgam under the Centre's premier loss reduction scheme of #RDSS: #KPDCL
@diprjk @MinOfPower @OfficeOfLGJandK @nasirsogami @GreaterKashmir @RisingKashmir