$SPCX @SpaceX @elonmusk
STACKING UNDER FIVE MINUTES. THAT IS THE CADENCE PATH.
Elon, on a time-lapse of Ship 42 being stacked onto the Flight 15 Super Heavy: "This will be fully automated and sped up to be <5 mins."
The first ship catch is official. The unpaid proof is still reuse and cadence. Elon is now putting a number on the stack step: fully automated, and under five minutes.
@InvestmentGuru_ @JOBhakdi @LayeredInvest @pbeisel @MentoviaX @Truthful_ast @Amy787 @joehansen @nextbigfuture @spcxGOD @itschrisray @johhnyWalkerAZ @KenKirtland17 @DutchSpace @jinseongeo83473
2
113
$SPCX @SpaceX @elonmusk @FCC
THE FCC AUTHORIZED STARMIND. ONE MILLION ORBITAL DATA-CENTER SATELLITES.
Elon replied overnight to the FCC Chair: "Much appreciated. This will be a great asset to America and the world."
The official FCC action, dated November 25, is a Space Bureau grant, in part and with conditions, of SpaceX's application for the Orbital Data Center System, called Starmind.
The authorization covers a constellation of 1,000,000 satellites in low Earth orbit. Starmind will rely on optical links for communications. The radio grant is for backup and emergency tracking and command only.
This is a permission unlock, not a revenue print. The first satellite must be on orbit and operating by November 25, 2033. Ten percent is due by 2035, half by 2038, and the authorized system completed by 2040. The license term is 15 years, starting when the first satellite is certified on orbit.
Launch cadence, optical links, and power in space still have to do the hard work. The file has moved from accepted-for-filing to a grant.
Patience and Conviction.
@InvestmentGuru_ @JOBhakdi @LayeredInvest @pbeisel @MentoviaX @Truthful_ast @Amy787 @joehansen @nextbigfuture @spcxGOD @itschrisray @johhnyWalkerAZ @KenKirtland17 @DutchSpace @jinseongeo83473
3
3
535
$RKLB @RocketLab
NEUTRON'S TEST CAMPAIGN IS UNDERWAY AT LC-3.
Official @RocketLab posted a Neutron Development Update this morning, dated 23 November 2026.
It walks through a test campaign with the Thrust Module and Stage 2 at Launch Complex 3.
These campaigns are about verifying the hardware, the ground systems, and operational procedures, bringing Neutron one step closer to flight.
The next proof still ahead is whether this pad work turns into a flight-ready vehicle.
@InvestmentGuru_ @JOBhakdi @LayeredInvest @pbeisel @MentoviaX @Truthful_ast @Amy787 @joehansen @RKLBMan @pbdes @itschrisray @johhnyWalkerAZ @KenKirtland17 @DutchSpace @jinseongeo83473
1
108
$TSLA $SPCX @Tesla @Starlink @elonmusk
STARLINK IN THE CAR. THE BANDWIDTH UNSUPERVISED FSD NEEDS.
Elon, asked whether Tesla would offer an embedded Starlink option in all models beyond the Cybercab: "Hopefully available towards the end of next year. This will be important for unsupervised FSD, so passengers have high bandwidth everywhere for work and entertainment."
The satellite link is not only a Cybercab feature. It is the connection passengers need if the car is going to drive unsupervised.
A dead cellular zone should not be the limit on that trip. Starlink in the vehicle is the connectivity unsupervised FSD will need on the road, and it extends Starlink cash from home terminals into the Tesla fleet.
@InvestmentGuru_ @JOBhakdi @LayeredInvest @pbeisel @MentoviaX @Truthful_ast @Amy787 @joehansen @nextbigfuture @spcxGOD @itschrisray @johhnyWalkerAZ @KenKirtland17 @DutchSpace @jinseongeo83473
128
$SPCX @SpaceX @elonmusk
DATA CENTERS ARE THE HARD JOB. SPACEX IS BUILT FOR THAT WORK.
Elon: "Getting this amount of compute turned on, cooled and working reliably is incredibly hard."
He also said the cash shortage next year is going to be nuts. Even a few months of delay between paying for compute and getting it reliable enough to generate revenue will mean hundreds of billions of dollars just for working capital.
A data center is not a warehouse for chips. It takes enormous capital, power, cooling, and deep technical expertise to get the compute on, keep it reliable, and only then earn revenue.
SpaceX already does work at that degree of difficulty. SpaceX site pages list a Supercompute campus at Starbase and a Cochise County campus in Arizona, with on-site power and dry cooling in the plan.
That is a real advantage: the capital and the engineering to build and run the factory, not just buy the chips.
@JOBhakdi @LayeredInvest @pbeisel @MentoviaX @Amy787 @joehansen @nextbigfuture @itschrisray @spcxGOD @Truthful_ast @InvestmentGuru_ @KenKirtland17 @DutchSpace @johhnyWalkerAZ @jinseongeo83473 @EdgeCGroup
2
255
$SPCX @SpaceX @elonmusk
32-HOUR PAD RECYCLE. FASTEST SAME-PAD TURNAROUND.
Falcon 9 and NROL-136 lifted off from pad 4E in California 32 hours after USSF-317, "completing our fastest turnaround between launches from the same pad."
Elon: "32 hour launch pad recycle. Great work by SpaceX team."
A fixed pad becomes more cash flights when the recycle gets shorter.
@JOBhakdi @LayeredInvest @pbeisel @MentoviaX @Amy787 @joehansen @nextbigfuture @itschrisray @spcxGOD @Truthful_ast @InvestmentGuru_ @KenKirtland17 @DutchSpace @jinseongeo83473 @EdgeCGroup @FranciscoSpace5
4
324
$RKLB @RocketLab @Peter_J_Beck
THE ENGINE COULD BE QUALIFIED TODAY. THE COMPANY BEHIND IT IS ALREADY IN MOTION.
In the Rocket Lab Weekly Q3 interview, Peter Beck was asked if Archimedes could be formally qualified today?If Neutron were ready in a couple of weeks. His answer was yes. Duration testing, thrust-vector movements, and mixture ratios are already done. They are leaving formal qualification until closer to integration, so they can keep testing, and so later design changes do not trigger more qualification work. That is a reliability choice, not a stuck engine.
Neutron’s first flight is still set for 2027. Sixteen missions are already sold, but Beck said that should not be read as an immediate launch requirement. They are looking at more aggressive, parallel scaling, without committing to a new cadence yet. Carbon-composite process development is the slow part up front. Once it is dialed in, he said production gets much faster.
CFO Adam Spice said the Electron factory was designed for about 52 rockets a year, or one a week, and that there is still unused capacity. Adding another production line would be relatively inexpensive, tens of millions of dollars and about 50,000 to 75,000 square feet. The real constraint is hiring and training the people who integrate the vehicle. Scaling from 50 to 100 launches a year is achievable, but it could take about two years of lead time. He also said the market has not yet fully reflected the potential increase in demand for dedicated small-launch services.
Gauss electric propulsion is being consumed mostly internally on high-priority defense programs, can fly across Photon platforms, and is being combined with chemical propulsion for high-energy interplanetary missions.
Geost has helped win missile-tracking work beyond the original SDA programs. Beck said HASTE is not near its peak. He also said he would not sell Rutherford or Archimedes engines, because owning the engine lets Rocket Lab optimize the whole vehicle.
Beck’s larger point was simple. If you want to put a large number of things into orbit, you need to own the launch vehicle. Companies can build as many satellite buses as they want, but without reliable launch they stay on the ground. Asked if Rocket Lab could use Electron and its own buses to demonstrate orbital data-center technology before Neutron flies, he said absolutely, they have the capability. He is not yet convinced that will become a major commercial market, and he will not put all of the company’s resources into it. If that assumption is wrong, he said Rocket Lab would be in an excellent position to pursue it.
That is a company with the engine, the factory, the spacecraft, and the launch path already in hand, choosing to finish Neutron properly rather than throw it on the pad early.
Patience and Conviction.
@jinseongeo83473 @FranciscoSpace5 @RKLBMan @spacepat_o @SpaceSector001 @Luis10024674
Neutron is closer than you think!
Executive interview with Sir Peter Beck and Adam Spice
$RKLB
With cohosts from rocket lab weekly, @MrsIglesiasRKLB @scotto2050 @daveginvesting @vinceisbullish
youtu.be/relCW3qTnqo?is=CC5m… via @YouTube
$RKLB @RocketLab
ROCKET LAB HAS BUILT AND SHIPPED MORE THAN 1,000 RUTHERFORD ENGINES.
@RocketLab just posted a Rutherford appreciation video. It calls Rutherford the first 3D-printed orbital class engine, and one of the highest volume manufactured engines in the world today. The company says it has built and shipped more than 1,000 of them to date.
Rutherford is the world's first 3D-printed, electric-pump-fed rocket engine. Electron flies nine sea-level Rutherford engines on the first stage, with lift-off thrust of 43,000 pounds, and one vacuum Rutherford on the second stage. That is not a paper engine. It is already the engine that puts Electron into orbit.
Electron is already the No. 2 small-lift rocket by how often it flies. A flight rate like that only holds if the factory can keep building engines and shipping them.
Most orbital engines never get made in these numbers. Rutherford did, and it is 3D-printed and electric-pump-fed. That is a real manufacturing edge for $RKLB on the small-lift business that is already flying and already delivering.
Patience and Conviction.
@RKLBMan @FranciscoSpace5 @AceCrouton @SpaceSector001 @ChenrySpace @TerezaPultarova @MrsIglesiasRKLB @Gykiwi03 @pbdes @SPACLiquidity @jinseongeo83473
1
4
867
$BKSY @BlackSky_Inc
COLLECTED AND DELIVERED IN UNDER 15 MINUTES. THAT IS THE SERVICE THEY SELL.
Official BlackSky tonight posted three views of Saemangeum, South Korea. Collect to deliver was 11 minutes, 7 minutes, and 14 minutes. All under 15 minutes.
For BlackSky, the cash sits in imaging services: how fast a customer can task a satellite and get the picture back. Tonight is a working example of that speed, with official photos. The service is running in minutes, not hours.
$BKSY @BlackSky_Inc
1
182
$RKLB @RocketLab @Peter_J_Beck
"FOR WHAT WE EXPECT FOR FLIGHT" ARCHIMEDES: 650+ TESTS, POWER ABOVE 100%.
129-second hot fire of the Archimedes boost engine, Neutron's reusable methane/LOX engine. Official figures are 650+ tests and power levels above 100%, across mixture ratios and inlet pressures "for what we expect for flight."
SEEMS LIKE ENGINE WILL PASS QC VERY SOON !!!!!!!!!!
@itschrisray @RKLBMan @topsecretstocks @quietnurse_ @KenKirtland17 @InvestmentGuru_ @heeraniparkash @DutchSpace @johhnyWalkerAZ @MentoviaX @Truthful_ast @joehansen @jinseongeo83473 @FranciscoSpace5 @diamond00888
83
$NOK @nokia @nscale @Telia @verdacloud @skel_tech
NOKIA IS LEADING A NORDIC-BALTIC AI GIGAFACTORY BID.
Nokia, with Nscale, Telia, Verda, and Skeleton, announced AI Gigafactory Northern, a European consortium formed to develop federated AI infrastructure across the Nordic and Baltic region.
The partners intend to submit a bid to build and operate it under the European High-Performance Computing Joint Undertaking call for tenders.
Planned sites are Oulu in Finland, Iru in Estonia, and Valmiera in Latvia, with the Swedish site still to be determined. Official Nokia's role is the connectivity and network infrastructure needed to link the sites and move data.
Patience and Conviction.
@HyperTechInvest @InvestmentGuru_ @JOBhakdi @LayeredInvest @MentoviaX @SKundojjala @itschrisray @disruptivedean @pbdes @FonsieTrader @JuhaVaris @joehansen
209
$SPCX @SpaceX @elonmusk
STARSHIP V4: ABOUT 70 METERS AND INCREASE 100% PLAY-LOAD TO 200 TONS.
After the official first ship catch, Elon put numbers on the next vehicle and the cost path. He wrote that Starship V4 will be about 70 meters long, roughly a 40 percent length increase, and that this allows more than 60 percent more propellant load. Engine count will be raised to 9, with 3 more Raptor-Vacuum engines added, and these will be higher-thrust V4 engines.
He later wrote that propellant cost per flight will drop below $500,000 and payload will exceed 200 tons.
@JOBhakdi @LayeredInvest @pbeisel @MentoviaX @Amy787 @joehansen @nextbigfuture @itschrisray @spcxGOD @Truthful_ast @InvestmentGuru_ @KenKirtland17 @DutchSpace @johhnyWalkerAZ @jinseongeo83473 @FranciscoSpace5
63
$RKLB @RocketLab @Peter_J_Beck @QPS_Inc
ELECTRON 100: MISSION SUCCESS. THE NEXT 100 ARE BOOKED.
“The Mountain God Rises" deployed the YAMATSUMI-II SAR satellite to a 575 km orbit for iQPS. That is the 11th Electron for iQPS, with 100% mission success since 2023.
iQPS has booked seven more dedicated launches through 2030.
Electron reached 100 launches faster than any other commercially developed rocket.
“The next 100 Electrons are already booked so we're only accelerating from here."
The milestone is official. The cash leg is the next hundred already on the book, not just the celebration clip.
@itschrisray @RKLBMan @topsecretstocks @quietnurse_ @KenKirtland17 @InvestmentGuru_ @heeraniparkash @DutchSpace @johhnyWalkerAZ @MentoviaX @Truthful_ast @joehansen @jinseongeo83473 @FranciscoSpace5
2
209
$RKLB @RocketLab @Peter_J_Beck
NEUTRON HARDWARE IS ON THE LC-3 MOUNT.
Official @RocketLab walked engine builds and hot fires, production of the largest carbon composite structures, and flight hardware testing on the launch mount at Launch Complex 3.
The booked Neutron demand still has to be converted on the factory floor and at the pad.
@itschrisray @RKLBMan @topsecretstocks @quietnurse_ @KenKirtland17 @InvestmentGuru_ @heeraniparkash @DutchSpace @johhnyWalkerAZ @MentoviaX @Truthful_ast @joehansen @jinseongeo83473
9
575
$SPCX @SpaceX @elonmusk
100 GW IN SPACE IS ABOUT 800 GW ON EARTH.
Elon wrote overnight, "We're aiming for 1 TW/year from Earth, rising to over 1 PW/year from the Moon." That is a yearly production aim from Earth, and a still-larger aim from the Moon. He also wrote that 100 GW in space is roughly equal to 800 GW on Earth.
Solar on Earth, he said, must be paired with massive batteries to keep powering compute at night, and supplemented with combustion or nuclear power during winter. "These are not the same at all."
@JOBhakdi @LayeredInvest @pbeisel @MentoviaX @Amy787 @joehansen @nextbigfuture @itschrisray @spcxGOD @jaehwa @AGTPinsights @gonta_southwood @Stefan_A @elontimes
60
$RKLB @RocketLab @mynaric @SES_Satellites @K2SpaceCo
THE OPTICAL TERMINAL JUST TRANSFERRED FILES BOTH WAYS.
A Mynaric CONDOR Mk3 on K2 Space Gravitas completed a bidirectional optical link with a Cailabs optical ground station on SES meoSphere Pathfinder 1.
SES's Carmel Ortiz said the terminal helped transfer files to and from the ground station, "a complete connection between computers on the ground and in orbit." Official @RocketLab quoted the Munich newsroom: "Congratulations to the Munich team!" Mynaric is a Rocket Lab company.
This is a completed space-to-ground file transfer. It is proof.
Patience and Conviction.
@itschrisray @RKLBMan @topsecretstocks @quietnurse_ @KenKirtland17 @InvestmentGuru_ @heeraniparkash @DutchSpace @AlphaOwlTrading @Neil_Shares @FangGoGo55 @FranciscoSpace5 @johhnyWalkerAZ @jinseongeo83473 @AceCrouton @nz482648
$SPCX @SpaceX @elonmusk @Starlink @FCC
800 MHZ IS IN FCC REVIEW. THAT IS NOT A CLOSE.
The FCC Wireless Bureau accepted for filing the applications to transfer control of Grain’s nationwide 800 MHz licenses to Starlink Spectrum Holdings, a SpaceX subsidiary. The official notice is DA-26-1218, WT Docket 26-313, released November 10. The applications cover 546 paired licenses and reach about 100% of the U.S. population.
Accepted for filing is the start of formal review, not consent, and not a close.
@JOBhakdi @LayeredInvest @pbeisel @MentoviaX @Amy787 @joehansen @nextbigfuture @itschrisray @spcxGOD @jaehwa @AGTPinsights @gonta_southwood @Stefan_A @elontimes @jinseongeo83473
1
297
$RKLB @RocketLab
ROCKET LAB RAN FROM $44 TO THE 50-DAY. THE HOLD IS THE TEST.
Rocket Lab closed November 10 at $62.71. That is about a 43% bounce from the November 5 low of $43.89, in three sessions. Tuesday was the first cash session after the Q3 print. It opened at $54.99 and closed at $62.71, just above the 50-day average near $62.42.
First, price is back above the 10-day average near $55.19 and the 20-day average near $54.45. The 50-day is the line that matters now. One close, $0.29 above it, is a test, not a finished hold. The 60-day average still sits just overhead, near $63.65.
Second, the slower averages are later work. The 120-day is near $78.20 and the 200-day is near $78.63, right next to the October 6 high at $78.28. A hold of the 50-day would open the $75 to $79 supply zone. The May high at $151.00 remains the long-range marker. On the 1-year chart, price is still only about 22% of the way up from the $37.57 low to that high, and about 58% below the peak.
Third, momentum is repairing, not racing. RSI(14) closed near 55.7 — mid-range, back above 50 since November 9. MACD crossed back above its signal on November 9, and the histogram has been expanding for three sessions, but the MACD line itself is still below zero, near −2.10. Tuesday’s volume was about 1.5 times the 20-day average, a second heavy day in this bounce.
Support starts at Tuesday’s low near $54.96, then $53, then the October shelf near $49.25, then the November 5 washout at $43.89. The 1-year low at $37.57 is the last major shelf. Resistance is the 60-day near $63.65, then $75 to $79, then the August high near $86.83.
The point is not to treat a three-day bounce as a new uptrend. The point is that $43.89 held, and the 50-day is the first real test. Hold that line, then work on $75 to $79. Structure first. Size later.
NOT INVESTMENT ADVICE.
Patience and Conviction.
@RocketLab @Peter_J_Beck @Fibonacci_TA @RKLBMan @FranciscoSpace5 @StonkValue @AlphaOwlTrading @PrimeTrading_ @SpaceSector001 @AceCrouton @jinseongeo83473 @Gykiwi03 @TheVan151 @MrsIglesiasRKLB @jinseongeo83473
5
379
$RKLB @RocketLab @NASA @ucbssl
BLUE AND GOLD ARE ON THEIR WAY TO MARS.
Both Explorer-class spacecraft completed trans-Mars injection. Each fired its main engine for 9.5 minutes and left Earth at more than 10 kilometers per second. The burns were better than 99% accurate, with attitude error under 1 degree.
Arrival is September 2027.
The bus did the cruise-defining burn itself. Space Systems cash-today is now on a trans-Mars trajectory.
137



















