Westport Update: Thurs, Nov 26
Bldg 2 received final coat of drywall mud. Hardwood floor installation completed.
First coat of drywall mud completed on second floor.
Floor prep started on Art/Music.
1
16
Westport Update: Wed, Nov 25.
Today we covered the sewer and fire service lines, started grading for sidewalks, and started work on a new road around the tennis court for carpool.
Hardwood flooring for Art/Music was delivered into the building tonight.
We are heating the building to 80 degrees overnight to speed up the drywall mud.
13
464
Westport Update: Tue, Nov 24
Bldg 2 (9 classrooms) received 2nd coat of drywall mud.
Art/Music received 1st coat.
Drywall hung in 2nd floor of Bldg 2 (lunch room)
Hardwood floors now installed in 8 of 20 classrooms.
Storm sewer made final connection.
1
12
491
Westport Update: Mon, Nov 23
Spray foam insulation finished tonight in Bldg 2.
Storm Sewer is 90% to final connection.
Last fire hydrant installed.
Plumbing, Electric, HVAC rough work completed in Bldg 1.
Most importantly, we received the final required permit today (after 1 yr 9 months).
18
576
Westport Update: Sun, Nov 22
Today, hardwood was installed in the hallway and 1st finish coat on drywall in Building 2. (It takes 3 coats.)
Status of the 3 buildings on campus.
Building 1: 9 classrooms (rough)
Building 2: 9 classrooms (finish drywall)
Art/Music: 2 classrooms (drywalled)
6 weeks left.
Westport Update: Saturday, Nov 20
Drywall hung in Art and Music building.
Plywood installed on floors in last 9 classrooms, so they are ready for hardwood.
Sidewalk grading 30% completed.
Roof deck insulated in Classroom Building 2.
Final LGE splice box installed
Storm sewer run 30% across field towards final connection.
9
455
Westport Update Nov 20, 2026:
Hardwood floors are catching up.
Hardwood installed in 5 of 20 classrooms and 1/4 of the hallway.
(Flooring install is happening at night.)
2 of 3 fire hydrants installed.
Storm drainage is moving towards the basin.
Sewers made final connection today.
1
11
468
Westport Update: Drywall is up in 9 classrooms, hallways, and common areas. Trim installation around windows started today. Flooring is running slower with hardwood in 3 classrooms and common areas.
Drywall finishing on 9 rooms starts this weekend. The goal is for interior paint and trim to start in earnest on those 9 classrooms next week.
1
15
523
Westport Campus update: Rough inspection this morning at 10. Exterior walls insulated at 2. First three classrooms drywalled this afternoon. Hardwood floors installing overnight.
3 classrooms down. 17 to go.
It is going to be tight.
2
18
810
Join us tomorrow (Nov 7) and Sunday (Nov 8) for Macbeth.
Shakespeare in the Park(ing lot) at Highlands Latin.
pci.jotform.com/form/2627757…
6
426
Great picture of @HighlandsLatin Air Force Academy Cadets and Naval Academy Midshipmen at the Navy-Air Force football game.
Brian Lowe retweeted
🏆 DOUBLE KCAC CHAMPS 🏆
History made — boys AND girls XC both win the KCAC Championship for the first time ever! Boys swept the top 5, girls took 2 of the top 5. Incredible start to the season, Coach O and team! 🏃♂️🏃♀️
#KCAC #XCountry #ChampionshipSeason
My mom's dream was that every student would learn Latin and Greek.
Good point. I was surprised to learn 10 years ago that 'classical education' in the US was code for 'traditional liberal arts' and did not necessarily imply the teaching of classical languages. Yet many of the best classical schools, like those sponsored by @MemoriaPress , did insist on learning Latin to a high standard.
12
652