Westport Update: Thurs, Nov 26 Bldg 2 received final coat of drywall mud. Hardwood floor installation completed. First coat of drywall mud completed on second floor. Floor prep started on Art/Music.
1
28
Westport Update: Wed, Nov 25. Today we covered the sewer and fire service lines, started grading for sidewalks, and started work on a new road around the tennis court for carpool. Hardwood flooring for Art/Music was delivered into the building tonight. We are heating the building to 80 degrees overnight to speed up the drywall mud.
13
465
Westport Update: Tue, Nov 24 Bldg 2 (9 classrooms) received 2nd coat of drywall mud. Art/Music received 1st coat. Drywall hung in 2nd floor of Bldg 2 (lunch room) Hardwood floors now installed in 8 of 20 classrooms. Storm sewer made final connection.
1
12
492
This is what the building looked like on Tuesday.
1
280
Westport Update: Sun, Nov 22 Today, hardwood was installed in the hallway and 1st finish coat on drywall in Building 2. (It takes 3 coats.) Status of the 3 buildings on campus. Building 1: 9 classrooms (rough) Building 2: 9 classrooms (finish drywall) Art/Music: 2 classrooms (drywalled) 6 weeks left.
1
1
18
799
Westport Update: Saturday, Nov 20 Drywall hung in Art and Music building. Plywood installed on floors in last 9 classrooms, so they are ready for hardwood. Sidewalk grading 30% completed. Roof deck insulated in Classroom Building 2. Final LGE splice box installed Storm sewer run 30% across field towards final connection.
9
455
Westport Update Nov 20, 2026: Hardwood floors are catching up. Hardwood installed in 5 of 20 classrooms and 1/4 of the hallway. (Flooring install is happening at night.) 2 of 3 fire hydrants installed. Storm drainage is moving towards the basin. Sewers made final connection today.
1
11
468
Westport Campus update: Rough inspection this morning at 10. Exterior walls insulated at 2. First three classrooms drywalled this afternoon. Hardwood floors installing overnight. 3 classrooms down. 17 to go. It is going to be tight.
2
18
810
Join us tomorrow (Nov 7) and Sunday (Nov 8) for Macbeth. Shakespeare in the Park(ing lot) at Highlands Latin. pci.jotform.com/form/2627757…
6
426
Great picture of @HighlandsLatin Air Force Academy Cadets and Naval Academy Midshipmen at the Navy-Air Force football game.
3
1
1
16
587
We are grateful for America. @HighlandsLatin
4
329