Robbie Leer retweeted
SpaceX has just released a new blog about Starship's upcoming 15th flight planned for Nov 13 with more info about what to expect, the significance of this flight, and their approach to safety:
"Starship is preparing to take a major step towards full reusability: bringing the Starship upper stage back to the launch site for a catch by the tower at Starbase.
To return Starship to Starbase, the spacecraft must now fly a safe trajectory that will take it over inhabited areas in northern Mexico and southern Texas to reach its launch site for catch. Like previous flight testing and the first successful mission to orbit, Starship’s flight profile for this ambitious mission is being designed with opportunities to safely end the mission early if necessary and will follow strict criteria before committing to the final phases of flight.
OUR APPROACH TO A SAFE RETURN:
On Flight 15, Starship will initially launch to a passively safe suborbital trajectory. This is the same flight profile used on Starship’s first orbital mission and ensures that any issues encountered during ascent or shortly thereafter will result in Starship reentering over a cleared area of the Indian Ocean.
After this initial ascent, flight controllers will assess the health of Starship’s systems before giving a “go” or “no-go” for orbit. If “go”, Starship will then perform an orbital insertion burn with a single Raptor sea-level engine, increasing its speed and achieving orbit around Earth.
Once on orbit, Starship will deploy its payload of Starlink V3 satellites. Three of these satellites have been modified to acquire imagery of Starship’s heatshield. This method of analyzing Starship’s heatshield has been tested on previous flights and is one of several data sources to help inform Starship’s readiness to return to the launch site on Flight 15.
After deploying its payload, Starship will then coast in orbit for another ~21 hours until its orbit aligns with Starbase for a return. During this multi-hour orbital coast, flight controllers will continuously perform manual and automated checks of Starship systems which, similar to the first orbital flight, will be intentionally conservative. They include Raptor engine health, loss of power or communications, the health of the flight computers and navigation sensors, the structural integrity of the propellant tanks and feedlines, the ability to hold tank pressure, and Starship’s ability to control its attitude.
During this prolonged coast phase, flight control teams have several options to end the mission early and return Starship to precleared areas of the Pacific Ocean if needed. These locations include early- and late-mission splashdown options around Hawaii and a mid-mission splashdown opportunity several hundred kilometers off the coast of Chile. These precleared areas, which were also used during Flight 14, provide a safe place to land Starship if any conditions arise that may preclude the ability to perform a safe reentry.
WHAT SHIP CATCH WILL LOOK (AND SOUND) LIKE:
Flight controllers will only permit Starship to return to Starbase if the vehicle’s status meets our internally developed, and FAA-approved, conditions for a return to launch site and catch.
If these requirements are met, Starship will perform a deorbit burn with a single Raptor 3 engine. This deorbit burn will alter Starship’s path to place the vehicle on a course to reenter Earth’s atmosphere at a specific point over the Pacific Ocean, thousands of kilometers uprange from Starbase.
During reentry, Starship can alter its flight path by moving its four control flaps. This will permit Starship to maintain a safe and known trajectory while guiding itself with high precision control toward Starbase. This control will also allow Starship to carry out a series of small turns in its trajectory to intentionally fly over sparsely populated areas of northern Mexico and southern Texas.
As Starship approaches Starbase from the west, the vehicle will weave its way around the major cities in the Rio Grande Valley, passing to the north of South Padre Island and out over the Gulf of America as it makes its final turn south towards Starbase. This banking maneuver has been demonstrated several times on previous Starship flight tests.
During this phase, residents of Cameron County and those in the nearby area may hear one or more sonic booms as Starship approaches the launch site. A sonic boom is a brief, thunder-like noise a person on the ground hears when an aircraft or other vehicle in the area flies faster than the speed of sound. The sonic boom does not present a health risk and what people experience will depend on weather and other conditions.
As Starship arrives over Starbase, it will perform the final bellyflop maneuver down towards the tower at Pad 2. This bellyflop was proven during a series of high-altitude test hops and during numerous suborbital flight tests. Shortly before reaching the tower, Starship will ignite its three sea-level Raptor engines and flip itself vertical while stowing its flaps. After the flip is complete, Starship will down-select to two Raptor engines and maneuver between the tower's mechanical arms, before down-selecting to a single engine as it comes to a near hover. The arms will close rapidly to catch Starship on its two catch fittings just below the forward flaps. Once Starship registers contact with the tower arms, it will shut down its final Raptor engine.
During reentry, flight controllers will have several options to end the reentry early and safely by intentionally tumbling Starship to ensure that it breaks up in the atmosphere before reaching land. There is also a late-reentry option to send Starship into the Gulf of America if any of its systems or the tower itself encounter an issue after reentry that would preclude a safe catch at Starbase.
THE HOLY GRAIL OF ROCKETRY:
Recovering an entire orbital launch system has never been done, and Starship has always been designed change that. This full recovery is often referred to as the Holy Grail of rocketry as it enables full and rapid reuse of a rocket – opening the door to airplane-like cadence where a vehicle flies again rapidly.
Reaching this milestone with Starship will allow SpaceX to unlock the true capability of Starship and will enable future missions to establish a permanent human presence on the Moon, expand the worldwide Starlink network, launch our Starmind supercompute constellation, extend the light of consciousness to the stars, and make life multiplanetary."
Video below of the what flight 15's mission profile is:
Permits are a black box. We made visibility the priority.
@TurboPermit estimates approval dates from similar recent projects, provides real time status across jurisdictions, and identifies the longest lead time reviews so they can be started.
It's faster to get where you're going when you see the path ahead. Check it out below!
1
61
I love agency and action. Wrapped LA @Techweek_ and realized nothing recharges me like other founders in motion. My highlights:
1. We had an incredible turnout and an engaged group that heard from Nick, Grace, Jesse and me. Our 2nd AI for Housing gathering may have to become an annual event! Glad the topic was part of the conversation at a time when housing innovation has to happen.
2. Great experience pitching @TurboPermit at PitchLive LA with founders working on very different problems. Thanks @AlphaEdisonLA and @amplifyla for the invitation!
3
79
I’ve known we had a great product, but haven’t done much to show people what it can do.
@TurboPermit is a faster way to get housing approvals:
• Real-time status updates through city integrations
• AI Plan PreCheck to catch errors and reduce resubmissions
• Emails written, read, and acted on
• Auto-filled forms eliminating repetitive work
Our goal is simple: less time managing permits, more time building homes.
Take a look, then explore a project tour or example project on our homepage (link in 1st comment).
10 jurisdictions across 5 states analyzed now. 𝗗𝗲𝗻𝘃𝗲𝗿 housing permits broke the pattern.
𝘛𝘺𝘱𝘪𝘤𝘢𝘭 𝘵𝘪𝘮𝘦 𝘵𝘰 𝘢𝘱𝘱𝘳𝘰𝘷𝘢𝘭:
• 𝗦𝗶𝗻𝗴𝗹𝗲-𝗳𝗮𝗺𝗶𝗹𝘆: 173 days
• 𝗔𝗗𝗨𝘀: 174 days
• 𝗧𝗿𝗮𝗰𝘁 𝗵𝗼𝗺𝗲𝘀: 75 days
In most jurisdictions, ADUs move faster than single-family homes. In Denver, the typical project over the last few years took almost the exact same time.
I'm curious to see how the City of Denver's recent AI plan-check contract affects these times in the years ahead. The full analysis is in the first comment. Great work, TurboPermit team.
1
1
46
Free-market solutions that increase housing supply and improve affordability should be top US priority. Govt intervention, unsustainable for builders and the country, will be demanded. Spain a preview.
Protesters outraged by the eviction of an 87-year-old woman camped overnight in Madrid's historic Puerta del Sol plaza, where more demonstrators — including multigenerational families — joined them on Sunday for a second day of protests over Spain's housing crisis. to.pbs.org/4AxL6qc
1
85
"Real-time housing permits by 2030!"
That was my answer to the question: What would you do with $400M and 250 workers?
Thanks for the mention in @Forbes, @patitzj. We’re moving as quickly as resources allow! (dms open :)
forbes.com/sites/jennifercas…
2
84
Articulated well by Suffolk + MIT in their AI in Construction research. Results creating more believers, “practitioners working within permitting constraints rather than on them, see this political bottleneck as a cost rather than a solvable problem ... people closest to the permitting problem believe most in AI’s potential to address it” suffolk.com/wp-content/uploa…
1
2
89
“You really can’t rain debris on people without them being very unhappy.”
Elon on confidence in Starship before flying over US/Mexico for a catch on the Gulf.
1
64
Eight jurisdictions. Eight unique processes.
Efficienct processes eliminate variaton and waste. Housing permitting has room to improve on both.
At TurboPermit, we’re using tech to create predictability, automate steps away, and helping builders get housing approvals faster.
Explore residential permit processes and more: turbopermit.co/approved
Atlanta, Georgia is the newest city in the @TurboPermit housing timeline insights series!
Single-Family time to approval climbed the last three years:
• 88 days in 2023
• 110 days in 2024
• 130 days in 2025
Median time to approval is substantially faster than what we saw in California.
• 𝗦𝗶𝗻𝗴𝗹𝗲-𝗙𝗮𝗺𝗶𝗹𝘆: 109 days
• 𝗔𝗗𝗨: 91 days
• 𝗧𝗿𝗮𝗰𝘁: 58 days
Review the complete analysis:
turbopermit.co/permit-approv…
2
131
🏠 Excited to announce AI for Housing: Tech to End the Crisis for #LATechWeek
This year we partnered with two other founders covering complementary parts of the housing lifecycle:
- TurboPermit: AI for housing permits
- HomeRES: AI for resilient and efficient construction
- Verustruct: automated housing construction (robotics)
The panel features myself, Grace Mase and Nick Callegari. We're lucky to have @jessezwick from the Housing Action Coalition moderating.
📅 Oct 14, 8:30–10:30am
📍 Santa Monica
🥐 Breakfast
Join us to discuss how technology can help get more housing built!
Sign up: partiful.com/e/14uk8TV3r4IG8…
Part of #LATechWeek by @Techweek_









