JC (@JC_Webb) header
JC (@JC_Webb) profile picture

Blasian Futurist. Building in AI, data infrastructure & biotech. Founding Head of Growth @ https://teapawt.org/t.co/WeSlgoF2hR. SI Main Street Investments. Senior Advisor @ Naveh.

Joined February 2009
Photo by JC (@JC_Webb)Photo by JC (@JC_Webb)Photo by JC (@JC_Webb)Photo by JC (@JC_Webb)Photo by JC (@JC_Webb)Photo by JC (@JC_Webb)
Pinned Tweet
Data → compute.
Compute → energy.
Shrink the data, save the energy. It starts with the data. Send it right. @datasent_x
Replying to @chanduuu_cs
Energy. Compute is energy. Data needs energy to generate and move. Humans are slow, fragile, energy-limited bags of meat. Once pure intellect is solved, the hard limit is how much power you can actually deliver to turn solutions into physical reality. Thermodynamics does not negotiate.
1
1
262
New hypothesis links the root cause of allergies to mitochondrial dysfunction. Allergies could potentially be mitigated by mitochondrial peptides like SS-31.
SS-31 (elamipretide) binds and stabilizes cardiolipin in the inner mitochondrial membrane, supporting ATP production and lowering ROS. Under the new outside-in allergy hypothesis, that mechanism could in principle ease energy failure in barrier epithelial cells and dampen downstream immune alarms. Preclinical work shows it protects airway epithelium from oxidative stress (ozone, smoke). No human data yet links it to reduced allergic disease, and the drug itself can trigger hypersensitivity or eosinophilia. Purely theoretical for now.
20
JUST IN: Goldman Sachs estimates memory will account for roughly 40% of total hyperscaler capex in 2028
38
96
24
1,315
135,822
Replying to @elonmusk @XFreeze
The rental price for large, coherent blocks of compute configured for high-bandwidth training is increasing, sometimes very significantly, but the price for small amounts of compute (below ~5k GPUs) is decreasing. Overall, the average rental price per GPU for SpaceX compute is rising.
308
619
233
8,689
1,289,266
Texas 345kV substations, connected by 345 kV transmission lines, mapped as a transit-style diagram for #30DayMapChallenge Day 25: Is This a Map? I really put my agent team to work on this one. I wanted to create a transit-diagram visualization for Day 25 as I've always liked them, but this isn't something I've created before. So this ended up as a really interesting exercise in AI-driven development, which I'll share as a window into how I work these days. Here's how I did it: - I used a couple lead agents working locally on my computer (Fable 5.2 as lead dev, Astra 6.2 as lead reviewer / QC agent) who deploy subagents as needed - We re-used archived HIFLD transmission line and substation data from some of my other posts - The data doesn't include topology so the agents built it by matching each line's ends to the nearest substation using sf in R. - We couldn't reasonably show the whole network so I had the agents draw the network we'd show with ggplot2 and iterate through it to select the "hubs" for the diagram - I let Fable/Astra exercise judgment here - We then did a verification pass. To make sure every link on the diagram is real, I had the agents write R code to make sure that two stations are joined only if the source has a chain of 345 kV lines between them that doesn't pass through another station on the diagram. This caught some errors! - I then had Fable build the diagram. It's a "hand-rolled" (figuratively) SVG written straight from R, with hover text in JavaScript. The output HTML page is only 41 KB in size. - Astra then did a blind QC check - it rebuilt the network from the raw files on its own and checked all 66 links to verify them. Of course, this diagram is not to scale, is based on archived data, and leaves out most of the Texas grid - so the utility of a graphic like this is going to be in the eye of the beholder. This was a fun one to put together though and it really reflects how I like to work these days. The agents are writing very sophisticated R code (hand-rolling the SVG myself would have taken forever) but they're using tools (sf, tidyverse, etc.) that I trust and have used for years. Check out the diagram: walker-data.com/map-challeng… And all of this month's maps: walker-data.com/map-challeng…
7
6
1
76
5,115
AI is redefining the criteria for becoming an economic superpower. The conversation has shifted from who has the largest population, to who possesses the most advanced military technology, to who controls the most powerful energy infrastructure. Where on earth are the biggest institutional-scale, asymmetric investment opportunities tied to this shift? Africa.
1
1
88
$3T | 1 TW | 2028–2045 Initial country focus: Kenya, Nigeria, Ghana, Rwanda, and Côte d’Ivoire. At Naveh Partners, we're currently building capital and infrastructure pipelines with Korea. Africa is the next frontier.
1
53
I recognize how audacious these numbers are. Africa currently has only about 1.3 GW of operating data center capacity across the entire continent. But if we align the exponential growth trajectory of AI with a vision of Africa as an emerging economic superpower, the potential upside could be unprecedented. Execution across Africa is historically challenging, and the continent is far from monolithic. Each market has distinct political, regulatory, economic, and infrastructure considerations. Building the fund and executing this vision will take time. Finding the right strategic partners, building institutional relationships, and establishing credible entry points in each market will be critical and rewarding work.
27
The American Renaissance, mapped. I sourced every US project of about $1 billion and up: 154 sites in 36 states, from chip fabs and artificial intelligence data centers to launch sites, steel mills and shipyards. $2.45 trillion announced, $1.29 trillion already firm. 1/9
292
1,025
356
5,712
1,124,436
GDP is going to uncouple from demographics and be determined by power infrastructure.
“Sovereign Provision of Compute” Some countries are beginning to understand what they are facing, Today the UK government is forecasting the UK economy ($4 tn GDP) will demand 11 to 21 GW of compute by 2030, and guides that these estimates err on the conservative side. That level of demand is simply not going to get served. Sovereign Provision of Compute is going to happen, OECD countries are already planning it. GDP is going to uncouple from demographics and GDP is going to be determined by infrastructure, and in particular power infrastructure. Interesting times! gov.uk/government/publicatio…
1
69
“Things are just getting started.” -CEO of AI at Microsoft
For all those people who keep predicting we're overbuilding chips / we aren't seeing jevon's paradox etc. Things are just getting started.
1
1
174
For all those people who keep predicting we're overbuilding chips / we aren't seeing jevon's paradox etc. Things are just getting started.
Replying to @fluxxrider
The prompt, by the way: make a presentation on the future of AI and basically the intelligence explosion. You can go full no anchor bias, like things are going to get crazy because they are. I want this presentation to be the most elaborately, insanely amazing presentation you've ever seen, with all sorts of graphics, transitions, whatever you want. I believe you can make it amazing because you have taste and you have the ability. Good luck, Claude. Opus 5.6 on xhigh (stealth tested on 5.5). I gave it **no creative direction** other than this. sorry this is it, AGI 2027 pack it up
105
330
113
2,674
520,905
I knew @ErikVoorhees as a crypto guy. Great watching the @veniceai team building this right.
Meet Venice, a billion dollar company who sold 113B ZDR tokens to OpenRouter yesterday. Most went to Baseten, Deepinfra, Fireworks, and Parasail 🧵
99
GPU prices jump 30-50% at CoreWeave.
This post got buried in last week's news. CoreWeave announced 30-50% GPU rental rate increases on new contracts signed. These are huge price increases. However, when we accumulated the Silicon Data on-demand GPU rental rate into YoY changes, we obtained changes in similar range.
1
94
Emma AI by @nuance_ai •Nuplex 1.0, audiovisual model +licensed human face +Sub 500ms latency +3 ex-Apple PhDs A woman who will launch 1,000 startups.
1
147
JC retweeted
Replying to @chanduuu_cs
Energy. Compute is energy. Data needs energy to generate and move. Humans are slow, fragile, energy-limited bags of meat. Once pure intellect is solved, the hard limit is how much power you can actually deliver to turn solutions into physical reality. Thermodynamics does not negotiate.
1,788
1,616
1,230
15,220
6,054,178
I don't think many people realize how much behind-the-meter data center capacity is likely to come online in the coming years. Today's numbers look relatively small. 3.8 GW operating and 6.2 GW under construction, according to our tracker at Cleanview. But the pipeline is much bigger. There's about 125 GW of planned BTM capacity. People are right to be skeptical that all of this comes online. But there's about 82 GW in the pipeline that looks pretty legitimate and likely. These projects have equipment, named tenants, experience, and/or hyperscaler backing etc. Depending on how you cut the data, 20-30% of planned data center capacity is expected to come from BTM capacity. Some of that is from temporary turbines. But a ton of it is planned to operate for 10+ years. Amazon's GW Ranch is 7.65 GW of nameplate gas capacity and has no plans to interconnect. There's been a group of people who have been skeptical of these projects from the start and have convinced their audiences and followers they'll never be built. I don't pretend to be able to predict the future. But if you think BTM data centers will be inconsequential, you should update your priors and consider listening to a few new podcasts.
36
40
15
278
47,896