🚢 (MILLENNIUM PARK) SHIPPING GHAT’S HOOGHLY GATEWAY IS GETTING A ₹57.5 CRORE MAKEOVER! 🌊🏗️
A modern, two-storey ferry terminal is under implementation at Shipping Ghat on the Hooghly, with L&T Geostructure Pvt. Ltd. executing the project and WBTIDCL as the implementing agency.
🔥 WHAT’S IN STORE?
🏢 1,878.21 sq. m. modern G+1 terminal
📍 2,352.25 sq. m. total project site area
🚢 New gangway-pontoon for the VIP jetty
🛳️ Existing passenger gangway upgraded to 4 metres
🛡️ Improved gangway and pontoon safety, addressing guardrail gaps and passenger-safety concerns
🚶 Safer pedestrian access at the railway level crossing
🛥️ Dedicated Vivada Cruise Terminal facilities with a separate entrance.
👑 VIP lounge and dedicated VIP jetty
🚽 Modern toilets and accessible facilities
🚗 Dedicated car and two-wheeler parking
🍽️ Restaurant, outdoor dining, food stalls and shops
🎟️ Ticket counters and spacious passenger waiting areas
♿ Lift and facilities for persons with disabilities
☀️ Rooftop solar provisions and energy-efficient design
📶 Wi-Fi, CCTV, ferry information displays and public-address systems
👥 Projected peak passenger intensity: 2,170 passengers per hour!
💰 Awarded contract value: ₹57.5 crore.
A major leap towards safer, more accessible and comfortable river transport, alongside improved facilities for cruise passengers on the Hooghly!
Note: The attached layout plan is not to scale and may not be entirely accurate. It is intended for general understanding but closely represents the actual layout.
🌊 SHIPPING GHAT IS READY FOR A NEW CHAPTER! 🚀
🚢 HOWRAH’S HOOGHLY GATEWAY IS GETTING A ₹112 CRORE MAKEOVER! 🌊🏗️
A state-of-the-art, 2-storey ferry terminal is coming up in Howrah, with L&T Geostructure Pvt. Ltd. executing the project and WBTIDCL as the implementing agency.
🔥 WHAT’S IN STORE?
🚢 3 new floating pontoons
🏢 7,896 sq. m. modern terminal
🚽 Accessible Toilets
🚇 Howrah Station Subway connectivity
🚗 Vehicle Parking Spaces
🍽️ River-side Restaurants, cafés & retail shops
🌊 River-viewing gallery
♿ Lifts, escalators & accessible facilities
☀️ 3,130 sq. m. rooftop solar installation
📶 Free Wi-Fi, CCTV & smart ticketing
👥 Passenger handling capacity: 8,310 per hour!
📅 Expected completion - 2028.
A major leap towards smarter, greener and more comfortable river transport in Howrah!
Note: The attached layout plan is not to scale and may not be entirely accurate. It is intended for general understanding but closely represents the actual layout.
THE HOOGHLY GATEWAY IS GETTING A NEW IDENTITY! 🚀
🤖 Made with AI
A major push to strengthen water transport infrastructure in Kolkata and Howrah! 🚢
AECOM India has been entrusted with preparing the metro system plan for 16 ferry terminals across Kolkata and Howrah. The scope also includes designing modern terminals with cruise facilities, alongside ferry operations at select locations.
The project is targeted for completion within 8 months.
The 16 identified locations are:
Shalimar Ghat
Golabari
Prinsep Ghat
Ahiritola
Babughat Ferry
Shovabazar
Ramkrishnapur Ferry Ghat
Bagbazar
Shipping Ferry Ghat
Kashipur
Fairlie
Belur Math
Armenian
Kutighat/Baranagar
Howrah Station Jetty
Dakshineswar
A significant step towards transforming the Hooghly into a stronger urban transport corridor, improving connectivity and unlocking the tourism potential of Kolkata and Howrah. 🌊
🚡 Ropeway connecting Belur Math and Dakshineswar!
Imagine travelling between two of Bengal’s iconic spiritual destinations via an aerial cable car across the Hooghly River!
🔹 Government of WB has appointed an agency who is conducting feasibility assessments for the Belur Math–Dakshineswar ropeway project.
🔹 On 26 November 2026, at Kolaghat, Chief Minister Shri Suvendu Adhikari confirmed that the Detailed Project Report (DPR) is currently under preparation.
This project could significantly boost religious tourism and improve connectivity in Howrah.
A promising prospect for Bengal!
🤖 Made with AI
📢 KMDA INVITES PRIVATE AGENCIES TO HELP WITH SINGLE-WINDOW CONSTRUCTION APPROVALS
The Kolkata Metropolitan Development Authority (KMDA) has issued a tender to empanel private agencies that will help investors and developers obtain various permissions and NOCs required for construction projects in Urban Local Bodies under the Kolkata Metropolitan Area (excluding Kolkata Municipal Corporation).
What will these agencies do?
Help prepare and submit applications.
Coordinate with different government departments.
Track applications and follow up on pending approvals.
The permissions may include environmental clearance, fire safety, lift/escalator, water and sewerage, airport height clearance and other statutory NOCs.
Important: These agencies will only facilitate the process. Government departments alone have the authority to grant or reject approvals. Empanelment does not guarantee any work or income.
📅 Last date to apply: 16 December 2026, by PM.
In simple terms, KMDA wants to create a panel of experienced private agencies to help make construction-related approval procedures more organised and easier to navigate.
🤖 Made with AI
🚨 BIG NEWS FOR WEST BENGAL!
NHAI has invited bids for preparation of DPRs for 3 important highway connectivity projects in West Bengal, covering a combined indicative length of 95 km!
Tender Highlights:
Authority: NHAI, Regional Office–Kolkata
Projects: 3 Highway Connectivity Projects
Total Indicative Length: 95 km
Work: Preparation of Detailed Project Reports (DPRs)
Consultancy Period: 272 days
Bid Submission Deadline: 17 December 2026
Projects Covered:
- Spur connectivity at Barsoi, Raiganj and Malda with the Moregram–Kishanganj Highspeed Corridor – 65 km.
- 4-lane Greenfield Kishanganj Bypass (Bengal–Bengal) – 25 km.
- Purnea More Bypass connecting NH-12 (Dalkhola Bypass) to NH-27 towards Siliguri – 5 km.
Why is it important?
Better connectivity between key towns and highway corridors.
Improved access to the Moregram–Kishanganj Highspeed Corridor.
Smoother movement of passengers and goods.
Potential boost to trade, logistics and regional development.
Another important step towards strengthening road connectivity in West Bengal and the adjoining region! 🚧
🚨 BIG NEWS FOR WEST BENGAL!
On 25th November 2026, NHAI invited bids for preparation of the DPR for the proposed Gojadanga–Jangipur section of NH-312, covering an indicative length of 225 km in West Bengal!
Tender Highlights:
Authority: NHAI
Project: Gojadanga–Jangipur Section of NH-312
Indicative Length: 225 km
Work: Preparation of Detailed Project Report (DPR)
Consultancy Period: 365 days
Bid Submission Deadline: 11 January 2027, 11:00 AM
Why is it important?
Potential improvement in connectivity across North 24 Parganas, Nadia and Murshidabad.
Better road connectivity between northern and southern parts of this corridor.
Smoother movement of passengers and goods.
Potential boost to regional trade and economic development.
A significant step towards planning better highway connectivity in West Bengal! 🚧
🤖 Made with AI
🚨 BIG NEWS FOR WEST BENGAL!
On 25th November 2026, NHAI invited bids for preparation of the DPR for the proposed 4-lane Greenfield Corridor of NH-112 from Barasat to Bongaon, covering an indicative length of 71 km!
Tender Highlights:
Authority: NHAI
Project: 4-Lane Greenfield Corridor of NH-112 (Barasat to Bongaon)
Indicative Length: 71 km
Work: Preparation of Detailed Project Report (DPR)
Consultancy Period: 365 days
Bid Submission Deadline: 11 January 2027, 11:00 AM
Why is it important?
Improved connectivity between Barasat and Bongaon.
Potential reduction in travel time and congestion on existing roads.
Smoother movement of goods and passenger traffic.
New opportunities for regional development.
Another important step towards strengthening road infrastructure in West Bengal! 🚧
🤖 Made with AI
🚨 BIG NEWS FOR WEST BENGAL!
On 25th November 2026, NHAI finally invited bids for preparation of the DPR for the proposed 250 km Kolkata Ring Road!
Tender Highlights:
Authority: NHAI
Project: Kolkata Ring Road
Indicative Length: 250 km
Work: Preparation of Detailed Project Report (DPR)
Consultancy Period: 365 days
Bid Submission Deadline: 11 January 2027
Why is it important?
Potential relief from Kolkata’s traffic congestion.
Better connectivity with neighbouring districts.
Faster movement of goods and vehicles.
New opportunities for regional development.
A major step towards better road connectivity in West Bengal! 🚧
🤖 Made with AI
1/6 | HOWRAH STATION REDEVELOPMENT IS ATTRACTING BIG INFRASTRUCTURE NAMES! 🚆🔥
Something BIG could be taking shape for one of India’s most iconic railway stations!
The proposed redevelopment of Howrah Railway Station is drawing interest from some heavyweight names in the infrastructure and design industry.
Creative Group, Archohm, Walter P Moore and Voyants Solutions have shown interest in the Eastern Railway assignment.
And their project portfolios are worth a closer look! 👀
🤖 Made with AI
🚆 Howrah Station is finally set for a major transformation and modernisation!
Eastern Railway invites a tender for preparing the complete redevelopment master plan and DPR under Amrit Bharat Scheme
The vision: a mega multimodal transport hub featuring:
🔹 Integration of trains, Metro, buses and ferries.
🔹 Separate entry and exit routes to ease congestion.
🔹 Planning across a 5-km influence area.
🔹 Provision for future High-Speed Rail connectivity.
🔹 Better pedestrian access, parking and passenger amenities.
🔹 Commercial development and monetisation of railway land parcels.
🔹 Riverfront and ferry-edge development, creating a better public interface with the Hooghly.
💰 Consultancy cost: ₹2.27 crore
A transformation that could reshape not just Howrah Station, but connectivity across Howrah and nearby areas!
2/6 | CREATIVE GROUP: A TRACK RECORD OF MEGA PROJECTS! 🏗️
Creative Group brings an impressive portfolio across India’s airport and railway infrastructure landscape.
✈️ Airport projects:
• Chennai International Airport – ₹1,212 crore
• Agartala Airport – ₹318 crore
• Raipur Airport – ₹150 crore
🚉 Railway station projects:
• Ahmedabad – ₹2,563 crore
• Chennai Egmore – ₹735 crore
• Coimbatore – ₹700 crore
• Ghaziabad – ₹450 crore
• Kota – ₹230 crore
From airports to major railway hubs, the group has experience with infrastructure on a massive scale!
🤖 Made with AI
🚨 BIG INFRASTRUCTURE PUSH FOR WEST BENGAL! 🚨
Union Minister Sh. Nitin Gadkari announces an ambitious roadmap for Bengal’s roads, highways, bridges and connectivity! 🛣️
🔥 KEY ANNOUNCEMENTS:
🏙️ 1. KOLKATA RING ROAD: ₹14,000 Cr | Approx. 250 km | To ease congestion.
✈️ 2. BELGHORIA EXPRESSWAY: ₹1,000 Cr | 7 km elevated 6-lane corridor | Approved | Better connectivity to Kolkata Airport.
🏔️ 3. SILIGURI–DARJEELING: ₹6,000 Cr | 77 km greenfield highway | 3 hrs ➡️ 1 hr.
🏔️ 4. SILIGURI–SIKKIM: ₹6,000 Cr | 52 km | 4 lanes | DPR completed | Tunnels & viaducts.
🏙️ 5. KOLKATA’S MULTI-LEVEL TRANSPORT VISION: A four-storey road bridge, flyovers and metro connectivity. Sh N. Gadkari has asked the state government to prepare the DPR, assuring funding.
🌏 6. BARASAT–PETRAPOLE: ₹8,000 Cr | 75 km | 4 lanes | Approved.
🚧 7. HIGHWAY BLACK SPOTS: ₹5,100 Cr | Safety improvements on accident-prone highway stretches.
🚗 8. SILIGURI–GUWAHATI: ₹26,000 Cr | 4-lane highway | 10 hrs ➡️ 4 hrs | Work targeted this year.
🏙️ 9. DANKUNI–KOLAGHAT: ₹20,000 Cr | 58 km | 8 lanes.
🌉 10. MAYURAKSHI BRIDGE, BIRBHUM: ₹1,000 Cr | 4 lanes.
🌉 11. MAHANANDA BRIDGE, DARJEELING: ₹270 Cr.
🌊 12. NANDKUMAR–DIGHA: 90 km road widening.
🌴 13. GANGASAGAR: Special road connectivity promised.
🇮🇳 Better roads. Faster journeys. Less congestion. More investment. Stronger Bengal!
Complete the Howrah Station Cable-Stayed Rail Overbridge Project!
The ₹173.94-crore Chandmari Cable-Stayed Road Overbridge near Howrah Station was planned to replace the nearly century-old bridge built in 1933. The 607-metre, four-lane bridge was originally scheduled for completion by September 2021.
While the main bridge structure has been completed, the approach-road works remained pending due to administrative approvals for traffic regulation from the state government.
The authorities must resolve these bottlenecks and ensure the completion and commissioning of the entire project without further delay.
Howrah deserves modern infrastructure and smoother traffic movement. It’s time to complete the Chandmari Cable-Stayed ROB in the larger public interest!
🤖 Made with AI
Revive the Long-Pending Salkia Flyover Project!
The Salkia Flyover, originally sanctioned in 2007 at an estimated cost of ₹30 crore, envisioned a 500-metre-long, two-lane elevated corridor at Salkia Chowrasta. A revised proposal in 2014 pegged the project cost at approximately ₹64 crore.
The project could significantly ease congestion at Salkia Chowrasta, improve connectivity along G.T. Road and Benaras Road, and benefit daily commuters, traders and local businesses.
The government must revisit this long-pending proposal and explore its implementation in the larger public interest.
Salkia needs better connectivity and lasting traffic solutions. It’s time to revive the Salkia Flyover Project!
🤖 Made with AI
Revive the Proposed Alternative Posta Flyover Project!
In 2021, a 6-km elevated corridor connecting Posta to Ultadanga via Maniktala and Kankurgachhi was proposed at an estimated cost of ₹1,000 crore, with RITES entrusted with the DPR and feasibility studies.
The project could significantly ease congestion in Posta and Burrabazar, improve connectivity towards Ultadanga and Howrah, and benefit commuters, traders and local businesses.
The government should revisit the proposal and explore its implementation in the larger public interest. Kolkata needs better connectivity and lasting traffic solutions!
🤖 Made with AI
Foreshore Road Works: Lowest Bidders & Potential Contractors
- Shibpur Burning Ghat–GCRC Ghat Road: Bengal Spun Pipe Industries (GST: 19AAKFB8585B1Z6)
- ISKCON Howrah More–Topiwala Ghat: Enduramix RMC Pvt. Ltd. (GST: Unavailable)
- GCRC Ghat Road–ISKCON Howrah More: Sakshi Vincom Pvt. Ltd. (GST: 19AAICS6759D1ZX)
- Topiwala Ghat–Banbihari Road: Usha Concern (GST: 19AQCPS7171C1ZP)
- Kazi Para More–Shibpur Burning Ghat: Sri Ramkrishna Engineering Works (GST: Unavailable)
How long must Howrah’s citizens live amidst garbage and filth? Don’t the citizens deserve clean streets and a healthy environment?
A clean environment is not a luxury.. it’s a basic right. Is anyone listening?
@HowrahMunicipal @udmawb @paulagnimitra1 @UmeshRai_BJP
J.N. Mukherjee road, Howrah.
🚨 Traffic Alert: Vidyasagar Setu (Second Hooghly Bridge) will remain completely closed to all vehicular traffic for 16 hours tomorrow, November 22, from 5 AM to 9 PM, to facilitate repair works, including the replacement of stay cables, holding-down cables and bearings.
Jonosharthe Jari!
A significant step towards the planned redevelopment of Mullick Ghat Flower Market. 🌸
Improved infrastructure, better sanitation, efficient waste management and riverfront beautification are key to transforming one of Kolkata’s iconic trading hubs.
The focus now should be on coordination and timely execution!
Kolkata Municipal Corporation hosted an inter-departmental coordination meeting to discuss the proposed redevelopment and management of Mullick Ghat Flower Market (Phool Bazar), at Conference Hall-1, Central Municipal Office Building.
The meeting was chaired by Hon’ble Minister-in-Charge Dr. Kalyan Chakraborti in the esteemed presence of KMC Administrator & Municipal Commissioner Smt. Smita Pandey, IAS, Hon’ble MLA Shri Vijay Ojha, Secretary, Department of Food Processing Industries & Horticulture, Government of West Bengal Smt. Smaraki Mahapatra, IAS, Estate Manager Syama Prasad Mookerjee Port Authority, Shri Saikat Dasgupta and Municipal Secretary Shri Kishore Kumar Biswas, along with other respected dignitaries, senior officials and members of KMC.
The deliberations focused on improved infrastructure, efficient waste management, sanitation and riverfront beautification, with an emphasis on coordinated efforts towards the comprehensive redevelopment of the flower market.
Was waiting for someone to call this out. Please withdraw this right now @SuvenduWB 🙏🏻
A very stupid decision by West Bengal Government to give free tickets on Premium Volvo AC buses.
The passengers boarding the bus are going to travel occasionally.
There is no issue if free tickets are given in city buses or buses which travel at max 100 km .
SAVE WBTC
12
725
🏙️ A Mega Residential Development Is Coming Up Near EM Bypass, Kolkata!
A landmark joint development by Purti Group and Das Organochem Pvt. Ltd. is coming up at 79, Canal South Road, Kolkata, spread across a massive 13.34-acre land parcel.
🏢 - 6 residential towers, each rising 36 storeys tall
🏡 - 565 apartments (503 4BHK + 62 5BHK)
🚗 - 1,885 car parking spaces
🌊 - 2.83 acres of waterbody
🌳 - 2.1 acres dedicated to tree plantation
🛕 - 1 temple
📍 NEARBY RESIDENTIAL PROJECTS:
- Purti Anaaya
- Siddha Sky
- Ambuja Neotia Udyatt
🚀 Another major addition to Kolkata’s residential real estate landscape around EM Bypass, bringing together high-rise living, spacious residences and expansive green and open spaces!



























