Kolkata Howrah Infra Updates retweeted
Here is how Kolkata's new bus stands will look.🧡
This one is from Lake Town, with several others currently in progress across the city.
🚢 (MILLENNIUM PARK) SHIPPING GHAT’S HOOGHLY GATEWAY IS GETTING A ₹57.5 CRORE MAKEOVER! 🌊🏗️
A modern, two-storey ferry terminal is under implementation at Shipping Ghat on the Hooghly, with L&T Geostructure Pvt. Ltd. executing the project and WBTIDCL as the implementing agency.
🔥 WHAT’S IN STORE?
🏢 1,878.21 sq. m. modern G+1 terminal
📍 2,352.25 sq. m. total project site area
🚢 New gangway-pontoon for the VIP jetty
🛳️ Existing passenger gangway upgraded to 4 metres
🛡️ Improved gangway and pontoon safety, addressing guardrail gaps and passenger-safety concerns
🚶 Safer pedestrian access at the railway level crossing
🛥️ Dedicated Vivada Cruise Terminal facilities with a separate entrance.
👑 VIP lounge and dedicated VIP jetty
🚽 Modern toilets and accessible facilities
🚗 Dedicated car and two-wheeler parking
🍽️ Restaurant, outdoor dining, food stalls and shops
🎟️ Ticket counters and spacious passenger waiting areas
♿ Lift and facilities for persons with disabilities
☀️ Rooftop solar provisions and energy-efficient design
📶 Wi-Fi, CCTV, ferry information displays and public-address systems
👥 Projected peak passenger intensity: 2,170 passengers per hour!
💰 Awarded contract value: ₹57.5 crore.
A major leap towards safer, more accessible and comfortable river transport, alongside improved facilities for cruise passengers on the Hooghly!
Note: The attached layout plan is not to scale and may not be entirely accurate. It is intended for general understanding but closely represents the actual layout.
🌊 SHIPPING GHAT IS READY FOR A NEW CHAPTER! 🚀
🚢 HOWRAH’S HOOGHLY GATEWAY IS GETTING A ₹112 CRORE MAKEOVER! 🌊🏗️
A state-of-the-art, 2-storey ferry terminal is coming up in Howrah, with L&T Geostructure Pvt. Ltd. executing the project and WBTIDCL as the implementing agency.
🔥 WHAT’S IN STORE?
🚢 3 new floating pontoons
🏢 7,896 sq. m. modern terminal
🚽 Accessible Toilets
🚇 Howrah Station Subway connectivity
🚗 Vehicle Parking Spaces
🍽️ River-side Restaurants, cafés & retail shops
🌊 River-viewing gallery
♿ Lifts, escalators & accessible facilities
☀️ 3,130 sq. m. rooftop solar installation
📶 Free Wi-Fi, CCTV & smart ticketing
👥 Passenger handling capacity: 8,310 per hour!
📅 Expected completion - 2028.
A major leap towards smarter, greener and more comfortable river transport in Howrah!
Note: The attached layout plan is not to scale and may not be entirely accurate. It is intended for general understanding but closely represents the actual layout.
THE HOOGHLY GATEWAY IS GETTING A NEW IDENTITY! 🚀
🤖 Made with AI
Replying to @Ricky_Bharat
The lack of development at Bandhaghat actually keeps the corridor open for the long-proposed Salkia (Bandhaghat)–Sovabazar Bridge, which could serve as an alternative to Rabindra Setu (Howrah Bridge). In that sense, it is a good thing.
1
24
A major push to strengthen water transport infrastructure in Kolkata and Howrah! 🚢
AECOM India has been entrusted with preparing the metro system plan for 16 ferry terminals across Kolkata and Howrah. The scope also includes designing modern terminals with cruise facilities, alongside ferry operations at select locations.
The project is targeted for completion within 8 months.
The 16 identified locations are:
Shalimar Ghat
Golabari
Prinsep Ghat
Ahiritola
Babughat Ferry
Shovabazar
Ramkrishnapur Ferry Ghat
Bagbazar
Shipping Ferry Ghat
Kashipur
Fairlie
Belur Math
Armenian
Kutighat/Baranagar
Howrah Station Jetty
Dakshineswar
A significant step towards transforming the Hooghly into a stronger urban transport corridor, improving connectivity and unlocking the tourism potential of Kolkata and Howrah. 🌊
🚡 Ropeway connecting Belur Math and Dakshineswar!
Imagine travelling between two of Bengal’s iconic spiritual destinations via an aerial cable car across the Hooghly River!
🔹 Government of WB has appointed an agency who is conducting feasibility assessments for the Belur Math–Dakshineswar ropeway project.
🔹 On 26 November 2026, at Kolaghat, Chief Minister Shri Suvendu Adhikari confirmed that the Detailed Project Report (DPR) is currently under preparation.
This project could significantly boost religious tourism and improve connectivity in Howrah.
A promising prospect for Bengal!
🤖 Made with AI
📢 KMDA INVITES PRIVATE AGENCIES TO HELP WITH SINGLE-WINDOW CONSTRUCTION APPROVALS
The Kolkata Metropolitan Development Authority (KMDA) has issued a tender to empanel private agencies that will help investors and developers obtain various permissions and NOCs required for construction projects in Urban Local Bodies under the Kolkata Metropolitan Area (excluding Kolkata Municipal Corporation).
What will these agencies do?
Help prepare and submit applications.
Coordinate with different government departments.
Track applications and follow up on pending approvals.
The permissions may include environmental clearance, fire safety, lift/escalator, water and sewerage, airport height clearance and other statutory NOCs.
Important: These agencies will only facilitate the process. Government departments alone have the authority to grant or reject approvals. Empanelment does not guarantee any work or income.
📅 Last date to apply: 16 December 2026, by PM.
In simple terms, KMDA wants to create a panel of experienced private agencies to help make construction-related approval procedures more organised and easier to navigate.
🤖 Made with AI
🚨 BIG NEWS FOR WEST BENGAL!
NHAI has invited bids for preparation of DPRs for 3 important highway connectivity projects in West Bengal, covering a combined indicative length of 95 km!
Tender Highlights:
Authority: NHAI, Regional Office–Kolkata
Projects: 3 Highway Connectivity Projects
Total Indicative Length: 95 km
Work: Preparation of Detailed Project Reports (DPRs)
Consultancy Period: 272 days
Bid Submission Deadline: 17 December 2026
Projects Covered:
- Spur connectivity at Barsoi, Raiganj and Malda with the Moregram–Kishanganj Highspeed Corridor – 65 km.
- 4-lane Greenfield Kishanganj Bypass (Bengal–Bengal) – 25 km.
- Purnea More Bypass connecting NH-12 (Dalkhola Bypass) to NH-27 towards Siliguri – 5 km.
Why is it important?
Better connectivity between key towns and highway corridors.
Improved access to the Moregram–Kishanganj Highspeed Corridor.
Smoother movement of passengers and goods.
Potential boost to trade, logistics and regional development.
Another important step towards strengthening road connectivity in West Bengal and the adjoining region! 🚧
🚨 BIG NEWS FOR WEST BENGAL!
On 25th November 2026, NHAI invited bids for preparation of the DPR for the proposed Gojadanga–Jangipur section of NH-312, covering an indicative length of 225 km in West Bengal!
Tender Highlights:
Authority: NHAI
Project: Gojadanga–Jangipur Section of NH-312
Indicative Length: 225 km
Work: Preparation of Detailed Project Report (DPR)
Consultancy Period: 365 days
Bid Submission Deadline: 11 January 2027, 11:00 AM
Why is it important?
Potential improvement in connectivity across North 24 Parganas, Nadia and Murshidabad.
Better road connectivity between northern and southern parts of this corridor.
Smoother movement of passengers and goods.
Potential boost to regional trade and economic development.
A significant step towards planning better highway connectivity in West Bengal! 🚧
🤖 Made with AI
🚨 BIG NEWS FOR WEST BENGAL!
On 25th November 2026, NHAI invited bids for preparation of the DPR for the proposed 4-lane Greenfield Corridor of NH-112 from Barasat to Bongaon, covering an indicative length of 71 km!
Tender Highlights:
Authority: NHAI
Project: 4-Lane Greenfield Corridor of NH-112 (Barasat to Bongaon)
Indicative Length: 71 km
Work: Preparation of Detailed Project Report (DPR)
Consultancy Period: 365 days
Bid Submission Deadline: 11 January 2027, 11:00 AM
Why is it important?
Improved connectivity between Barasat and Bongaon.
Potential reduction in travel time and congestion on existing roads.
Smoother movement of goods and passenger traffic.
New opportunities for regional development.
Another important step towards strengthening road infrastructure in West Bengal! 🚧
🤖 Made with AI










