BK321 ๐บ๐ธ retweeted
News: The US intel community is still working to understand the relationship between a Chinese businesswoman who had an affair with Nvidia CEO Jensen Huang and the Chinese government, with multiple sources telling CNN that the intelligence collected on her to date does not prove that she was acting as a spy for Beijing.
cnn.com/2026/11/12/politics/โฆ
BK321 ๐บ๐ธ retweeted
An open offer to Tesla: We fully support putting Cybercab first, and weโd be glad to take the Cybertruck line off your hands.
Weโd fund it with a consortium of investors and run it at no cost to Teslaโs floor space, headcount, or focus. All of that goes to Cybercab. Cybercab gets first call on battery cells too. Weโll wait our turn.
Tesla gains incremental profit: a license fee, plus FSD and Robotaxi network revenues on every vehicle built.
Weโd build the Cybertruck, a three-row CyberSUV, and an unmanned CyberCargo hauler. More autonomous miles, across every surface of this planet and beyond.
Worth a conversation?
Replying to @cradrrat
We have dumped JAX/SGLang and rewritten the entire RL and inference stack from scratch in C/C++, which took some extra time.
Training (aka pre-training) is done. Lot of cleanup was needed on the SFT data to get that mostly right. Now, 4.8 is in RL and the evals are starting to climb. We will do a soft rollout to Bot users later this week and see how it goes.
Grok 4.8 will bear no resemblance to 4.7 (thankfully). It is not yet incredible, but, this time, the foundations are built right, so I expect it to evolve to be something special.
Holy shit, first run over my project code base. Fable 5.2 is extremely fast and thorough. Fable 5.2 found 14 points to improve my code base for this project that had the majority of it either built or rebuilt with Opus 5.5 yesterday. So bullish on SI
Fable 5.2 is now available in the Claude Platform and Claude Code.
Itโs up to 30% faster than Fable 5.1, and costs $8/$40 per 1M tokens, down from $10/$50.
2
91
This is great and proof that if youโre smart and ambitious the jobs arenโt going away theyโre evolving.
3
37
BK321 ๐บ๐ธ retweeted
"god when is meta ever going to launch muse voice they announced it forever ago"
muse:
๐ค Made with AI
BK321 ๐บ๐ธ retweeted
Data centers in Loudoun County, Virginia: โWe get $1.2 billion a year in local tax revenue, about 40% of all of our tax revenue...on 3% of our landโ
Buddy Rizer, the county's economic development chief, explained how โdata center alleyโ grew:
โWe would have never looked at having 55 million square feet of data center, 230-some buildings. That was not the plan. The plan was to utilize the fiber loop, the internet exchange, to utilize a reclaimed water line, and buildings that were already built. That was the plan, right? And so that made a lot of sense.โ
โBut, you know, fast forward, today we are largely dependent on that. We get $1.2 billion a year in local tax revenue, about 40% of all of our tax revenue. And while that looks overwhelming, data centers take only about 3% of all of our land in the county. So itโs quite a return on investment. You know, 40%, $1.2 billion, on 3% of our land.โ
SpaceXโs Arizona data center, per a county supervisor: โWe could be reducing property taxes across the board in Cochise County, the entire county, by 20%โ
Frank Antenori, whose district includes the site, brought up the countyโs tax math during a live Q&A:
โHereโs just something to just chew on. Arizona has an expenditure limit requirement that is placed on counties. If we exceed that expenditure, we have to rebate back to the taxpayers a certain amount.โ
โSo, if weโre receiving revenue in from SpaceX, by law, we have to offset that to the taxpayers. We have the potential to reduce, based on the projected revenue theyโre creating, as much as 20%.โ
โLet me just say it again. We could be reducing property taxes across the board in Cochise County, the entire county, by 20% to offset for the revenue here, because we canโt spend all that money. So, we have to give that money back to the taxpayers. The law says we have to.โ
โSo, you could see a potential significant impact to local property taxes. What that is, I donโt know. Weโre going to have to do the math on it. But the law, if we have this large increase in property tax revenue, we have to balance those rates. So that will reduce dramatically the property tax burden of every resident in the county.โ
โThe construction sales tax, which also is the TPT, the transaction privilege tax, the retail tax, and the jail excise tax. So that will be part of the construction tax. We could literally use that money to pay the jail off in 2 to 3 years, as opposed to the 13 to 20 years.โ
โSo this could be a revenue to eliminate the half-cent sales tax in 2 to 3 years. We can get rid of that half-cent sales tax.โ
So what am I supposed to do for the next 4 days? I still have my Claude subscription but I like running everything through my chief of staff @bot. $100/month plan and I still canโt make it more than 48 hours. 81% of my usage is by builder bot spinning up @cursor_ai cloud agents. Switching from Grok 4.7 fast to normal bought me about 12 hours.
2
2
55
Riley Trettel (Energy & Data Center Development at SpaceX) in yesterdays Cochise Data Center meeting.
He claims the project will deliver up to:
- 40% off residential power bills for Sulphur Springs members, for the life of the project
- $53 million a year to the SSVEC Foundation, for education and the community
- $190 million a year in extra capital for Sulphur Springs, for projects or back to members
- $200 million a year for AEPCO and its members. About $100 million of that for Sulphur Springs
- $3.6 billion in new power lines, paid by SpaceX and given to the co-op. The co-op takes on no debt
- $30 to $100 million a year in new property tax, and a 20% cut in everyone else's county property taxes
- $250 million, one time, in sales tax. He said it could pay off the jail bond and fund the sheriff, fire districts, and the hospital
- $50 billion invested in the project
- 1,000 permanent jobs and 5,000 construction jobs
- No industrial water. Water for staff and maintenance about equal to 20โ30 homes a year
- No gas turbines and no power plant on the site. The computers buy power from the co-op grid
- Dark-sky lighting, pointed at the ground
- Cooling equipment more than 1,500 feet from any neighboring property line or public road
This project is clearly extremely positive for the area.