B (@bpol69) profile picture

Ik ben gesteld op privacy en een professionele belegger met tientallen jaren ervaring aan zowel de buy-side als de sell-side

Joined May 2018
Photo by B (@bpol69)Photo by B (@bpol69)Photo by B (@bpol69)Photo by B (@bpol69)Photo by B (@bpol69)Photo by B (@bpol69)Photo by B (@bpol69)Photo by B (@bpol69)Photo by B (@bpol69)Photo by B (@bpol69)
$INTC Foundry has its first customer to officially announce EMIB, and it's $MSFT. @Microsoft will use @Intel_Foundry EMIB advanced packaging for Azure first-party silicon. To be clear, it's EMIB, not EMIB-T. There was some confusion. And the packaging piece is separate from the Xeon piece, even though both sit under one long-term agreement. What was announced: - EMIB packaging for Microsoft's own custom Azure silicon (Cobalt and or Maia) - Multi-year Xeon supply capacity, including next-gen Diamond Rapids - Xeon work in Azure on CXL memory, QuickAssist and TDX confidential computing - No terms, volumes or timing Some thoughts: -Packaging is the door into foundry. It's a smaller commitment than wafers and it goes straight at a real bottleneck. I've been saying the transistor isn't what limits AI anymore. Power, memory and packaging are. -Somebody had to go first. No one wants to be the first company to put its name on non TSMC, and now someone has. I'll be honest: I had Google and AWS as the likely first packaging announcements. Microsoft got there first. -This is the follow-through I was looking for. @LipBuTan1 has said he won't spend capex without a customer commitment, and on the October call he said a couple of packaging customers would be ready to announce in the next two quarters. Less than three weeks later, here's the first one. -The Xeon piece matters on its own. Agents need CPUs, and Intel says supply stays tight into 2028. Locking in multi-year capacity, Diamond Rapids included, is Microsoft buying supply insurance. -What's missing: terms, volumes and which chips exactly. Packaging gets Intel in the door. Wafers, 14A above all, are where foundry makes its money, and I still think that's 2029 or 2030. Congrats to the Intel Foundry folks.
Replying to @Microsoft
@Microsoft and Intel are expanding their decades-long collaboration, with plans to use Intel Foundry's EMIB advanced packaging technology to advance Azure infrastructure for cloud and AI. Learn more: ms.spr.ly/6019x1yiv #IntelFoundry #MSIgnite
27
36
2
284
16,347
Microsoft says it will use Intel Foundry's EMIB advanced packaging for its AI accelerator chips, becoming the first company to publicly announce it, it said. The long-term deal also locks in multiyear Xeon server CPU supply, including next-generation Diamond Rapids. $MSFT $INTC #semiconductors news.microsoft.com/source/20…
5
13
1
71
9,831
Down 92%… Turns out he is worse than an average FinX degenerate.
Leopold Aschnbrenner's fund, Situational Awareness, sold nearly its entire stock portfolio and went from $20.24B at the end of June to about $1.58B at the end of September after closing its positions. This represents a 92% drop. Ouch.
13
9
115
14,602
Morgan Stanley's 2027 price targets
"we raise US investment grade to equal weight, cut high yield to underweight, and move up in quality within both hard-currency emerging market sovereigns and securitized credit" - MS
75
388
32
2,681
591,359
The #HBM expansion race shows little sign of slowing! Despite #NVIDIA’s leadership uncertainty, #SKhynix and #Samsung continue to advance their capacity plans, with several major projects already in the pipeline.
#NVIDIA’s leadership turmoil isn’t slowing #SKhynix’s #HBM push. Its Yongin Fab 1 has reportedly completed structural construction, while the company is said to be lining up fresh HBM4 equipment orders for its P&T6 facility in Cheongju.💡More: pse.is/9vg69x 🔗
1
5
27
5,446
Morgan Stanley recommends “max overweight” on global stocks, citing an intact AI capital spending cycle that will extend resilient economic and earnings growth into next year bloomberg.com/news/articles/…
13
15
7
101
41,443
ASML has two new customers for its EUV lithography tools, as Taiwan DRAM makers Nanya and Winbond move to the technology, media report. Nanya will use EUV for the first time in its new NT$480 billion (US$) Fab 5A in north Taiwan, which will begin equipment move-in in the 1st quarter (Q1) next year. The fab is expected to begin production by end-2027, and capacity of 30,000 wafers per month (wpm) by end-2028 and reach full capacity 50,000wpm by end-2030. Winbond says ASML has promised its first EUV tool in about 2-years, with later tools taking about 3.5 years at current lead times. It aims to use EUV in 2030 on its 2nd-gen 14nm process at its fab in Kaohsiung, south Taiwan, which breaks ground Dec 29. Neither company has disclosed how much it will spend on EUV. $ASML #Taiwan #NanyaTech #Winbond #semiconductors
8
608
SK Hynix is building a US$450 billion (₩600 trillion won) four-fab complex just outside of Seoul, South Korea, Nikkei Asia reports, adding 25,000 people are working round the clock to ready the first, Y1, for operation by end-February 2027. Y1 will be 50-stories tall when complete, ‘likely the world’s largest semiconductor building,’ the report says. SK Hynix plans to triple wafer capacity by 2034, and the Yongin site is vital to that plan. Samsung is also investing ₩360 trillion in the region for six fabs. $SKHY $NVDA $SSNLF $ASML $LRCX $KLAC $TOELY $AMAT #HBM #semiconductors asia.nikkei.com/business/tec…
12
33
9
236
15,695
BREAKING: Hundreds of NVIDIA employees reportedly sign an internal letter calling for Jensen Huang’s reinstatement as CEO and the board’s resignation
4
1
20
2,731
🔥 No DRAM fabs, no problem? #TSMC may be staying out of memory manufacturing, but it’s far from a bystander in the AI-driven semiconductor boom.
#TSMC may be staying out of DRAM manufacturing after VIS’ past setback, but it’s hardly sitting out the memory boom. From embedded DRAM and HBM base dies to wafer-to-wafer stacking, the foundry giant is carving out its own role in the race.💡More: pse.is/9v62ee 🔗
4
3
1
22
5,278
*SPACEX PURSUING ~$50 BILLION SUPERCOMPUTE CAMPUS IN ARIZONA
30
65
7
1,368
99,618